Project scheduling and forecasting by laws of physical movement
Bibliographic record
Abstract
Measuring actual project progress and comparing it with the planned time schedule is essential in controlling of a project. The outcome of the latter follows the s-curve diagram, which compares actual progress with the planned amount and finally analyzing any gap between them to draw directions for project scheduling. However, final duration of the project cannot be either estimated or predicted through conventional methods. The new method, using Rules of kinematics, can calculate the final duration of the project. This novel approach is successfully implemented on a construction project. The first objective in new method is forecasting final duration of the project, finding equation path and draw a new s-curve diagram for actual status during the execution process. The second objective is to evaluate schedule performance of the project and report the status of the project at each period which is a useful tool for managers.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame machine prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.
Distilled classifier scores by category (both heads)
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.002 | 0.006 |
| Meta-epidemiology (narrow) | 0.001 | 0.001 |
| Meta-epidemiology (broad) | 0.001 | 0.001 |
| Bibliometrics | 0.001 | 0.002 |
| Science and technology studies | 0.001 | 0.001 |
| Scholarly communication | 0.002 | 0.002 |
| Open science | 0.001 | 0.001 |
| Research integrity | 0.001 | 0.001 |
| Insufficient payload (model declined to judge) | 0.004 | 0.001 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".