Canada and Commercial Satellite Imagery: Technology in Search of a Foreign Policy
Bibliographic record
Abstract
Commercial satellite imagery (CSI) has a wide range of new and exciting uses for Canada. CSI is also playing an increasingly important role in determining the impact of climate change on Canada. The government was essentially following the policy established in 1967, which was that the development of industrial capability was the primary purpose of the Canadian space program. The report commented only briefly on the development of Canadian foreign policy and there was no mention of Canadian security policy and space. From the beginning of the 1970s to the mid-1980s, there was little evidence that the Canadian Government gave much thought or credence to the development of a space policy that would be explicitly tied to either defence or foreign policy. The Parties agree to ensure that such commercial remote sensing systems will be controlled by each Party in a comparable manner in order to protect and serve shared national security and foreign policy interest.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".