MétaCan
Menu
Back to cohort
Record W2924175890 · doi:10.2523/iptc-19440-ms

Novel Pseudo Dry Gas System for Extended Subsea Tie-Backs

2019· article· en· W2924175890 on OpenAlexaff
Andrew Rafty, Laura Liebana, Terry Wood, Stephen Stokes

Bibliographic record

VenueInternational Petroleum Technology Conference · 2019
Typearticle
Languageen
FieldEngineering
TopicOffshore Engineering and Technologies
Canadian institutionsIntecsea (Canada)
Fundersnot available
KeywordsSubseaSubmarine pipelineDry gasPetroleum engineeringPipeline transportGas compressorMarine engineeringPipeline (software)Environmental scienceEngineeringComputer scienceMechanical engineering

Abstract

fetched live from OpenAlex

Abstract The ‘Pseudo’ Dry Gas (PDG) subsea concept is being developed to dramatically improve the efficiency of subsea gas transportation by removing fluids at the earliest point of accumulation. The technology will increase the geographical reach from receiving gas terminals, allowing asset owners to prolong production life without the need for more expensive design solutions. This paper will provide an overview of the innovative technology, demonstrating that a 200 km plus tie back can be achieved, without compression. Increasing the distance of subsea tie-backs increases the liquid inventory, with constraints on pipeline diameter for slug free flow. The PDG concept is based on a main gas line integrated with piggable gravity powered drain liquid removal unit and pumps (a smaller fluid line transports separated liquid). Multiple units are specified to drain liquids as they condense in the line, maintaining near dry service. Liquid free operation removes the constraint on pipeline diameter. Specification of a large diameter pipe (within installation limits) reduces backpressure on the wells, enhancing recovery. Minimum stable flow limits are removed, improving tail end recovery. Current stranded gas development options (subsea compression, floating facilities, FLNG) generate a step change in costs which can make a project uneconomic. This is even more acute in mature and semi-mature basins where existing gas processing facilities / LNG terminals already exist offshore or onshore along with sunk costs from the exploration. A case study for a 185 km pseudo dry gas subsea tie-back to shore demonstrates the PDG concept feasibility. This result is used to argue that the PDG concept should be included in the suite of subsea processing options considered by Operators in early field development planning.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.798
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0010.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.009
GPT teacher head0.212
Teacher spread0.203 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2019
Admission routes1
Has abstractyes

Explore more

Same venueInternational Petroleum Technology ConferenceSame topicOffshore Engineering and TechnologiesFrench-language works237,207