MétaCan
Menu
Back to cohort

What are the real risks for tailings facilities?

2019· article· en· W2936933705 on OpenAlexaboutno aff

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicTailings Management and Properties
Canadian institutionsnot available
Fundersnot available
KeywordsTailingsComputer scienceEnvironmental scienceRisk analysis (engineering)BusinessMetallurgyMaterials science

Abstract

fetched live from OpenAlex

The movement towards risk-based design and operation of tailings storage facilities (TSFs) has taken place over the last few decades. The establishment of the consequence of failure of a facility is used to determine the design criteria to be used in its design. These criteria generally set the acceptable return periods for seismic and hydrologic events that the facility must accommodate. In addition, there are generally several levels of risk assessment of the design carried out to highlight technical risks that require particular attention and controls to manage. These are usually addressed in the design phase of project development. Despite this focus on technical risk assessment at the design phases of the development of a TSF, there is still a significant number of failures occurring every year. In recent times, there have been a number of high profile TSF failures in facilities owned by major mining houses and/or located in highly regulated, first world countries. In almost every case, the investigations into the failures have been carried out by high profile, internationally recognised geotechnical engineers who have identified the technical reasons for the failure. In many cases, it has been shown that the root causes of the failures have been a failure in governance, capital constraints, change management, independent reviews, construction supervision, operation, etc. The investigation of failures and reports to the public are almost exclusively focused on the technical cause with much less focus on what is often the underlying root cause. A number of international mining industry groups have recognised the lack of effective governance as being a major risk that could lead to TSF failures. The Mining Association of Canada (MAC) and the International Council on Mining and Metals (ICMM) are two examples. In this paper, the various methods for risk assessment and management are described. Non-technical risks that arise in the design and operation of TSFs are discussed and importance of good governance and continuity of its application during the full lifecycle of the facilities is emphasised.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.620
Threshold uncertainty score0.328

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.033
GPT teacher head0.229
Teacher spread0.197 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations3
Published2019
Admission routes1
Has abstractyes

Explore more

Same topicTailings Management and PropertiesFrench-language works237,207