Exploring the Benefits of Early Contractor Involvement (ECI) and the Mechanism for Automated 5D BIM Quantification Process in Offsite Modular Construction

2016· article· en· W2938571905 on OpenAlexvenueno aff
Tochukwu Moses, David Heesom, David Oloke, Martin Crouch

Bibliographic record

VenueModular and Offsite Construction (MOC) Summit Proceedings · 2016
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsnot available
Fundersnot available
KeywordsIntegrated project deliveryBuilding information modelingProcess (computing)Process managementActivity-based costingDeliverableKey (lock)Construction managementRisk analysis (engineering)Government (linguistics)Modular designCost reductionConstruction engineeringEngineeringProject managementSystems engineeringOperations managementBusinessComputer scienceComputer securityCivil engineering

Abstract

fetched live from OpenAlex

The UK Construction Industry through its Government Construction Strategy has recently been mandated to implement Level 2 Building Information Modelling (BIM) on public sector projects. This move, along with other initiatives is key to driving a requirement for 25% cost reduction (establishing the most cost-effective means) on. Other key deliverables within the strategy include reduction in overall project time, early contractor involvement, improved sustainability and enhanced product quality. Collaboration and integrated project delivery is central to the level 2 implementation strategy yet the key protocols or standards relative to cost within BIM processes is not well defined. As offsite construction becomes more prolific within the UK construction sector, this construction approach coupled with BIM, particularly 5D automated quantification process, and early contractor involvement provides significant opportunities for the sector to meet government targets. Early contractor involvement is supported by both the industry and the successive Governments as a credible means to avoid and manage project risks, encourage innovation and value add, making cost and project time predictable, and improving outcomes. The contractor is seen as an expert in construction and could be counter intuitive to exclude such valuable expertise from the pre-construction phase especially with the BIM intent of äóÖbuild it twiceäó», once virtually and once physically. In particular when offsite construction is used, the contractoräó»s construction expertise should be leveraged for the virtual build in BIM-designed projects to ensure a fully streamlined process. Building in a layer of automated costing through 5D BIM will bring about a more robust method of quantification and can help to deliver the 25% reduction in overall cost of a project. Using a literature review and a case study, this paper will look into the benefits of Early Contractor Involvement (ECI) and the impact of 5D BIM on the offsite construction process.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.025
metaresearch head score (Gemma)0.033
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.025
Threshold uncertainty score0.131

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0250.033
Meta-epidemiology (narrow)0.0000.001
Meta-epidemiology (broad)0.0000.001
Bibliometrics0.0010.001
Science and technology studies0.0020.005
Scholarly communication0.0080.009
Open science0.0030.009
Research integrity0.0020.003
Insufficient payload (model declined to judge)0.0150.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.032
GPT teacher head0.213
Teacher spread0.181 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2016
Admission routes1
Has abstractyes

Explore more

Same venueModular and Offsite Construction (MOC) Summit ProceedingsSame topicBIM and Construction IntegrationFrench-language works237,207