Challenges with use of risk matrices for geohazard risk management for resource development projects

2019· article· en· W2945917318 on OpenAlexaff
Michael J. Porter, Matthew Lato, Pete Quinn, John Whittall

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldHealth Professions
TopicOccupational Health and Safety Research
Canadian institutionsBGC Engineering (Canada)
Fundersnot available
KeywordsGeohazardRockfallRisk managementAsset (computer security)Natural hazardRisk analysis (engineering)Risk assessmentBusinessEnvironmental resource managementHazardEnvironmental planningComputer scienceEnvironmental scienceGeographyEngineeringLandslideComputer securityGeotechnical engineeringFinance

Abstract

fetched live from OpenAlex

Geohazards comprise a subgroup of natural hazards associated with geotechnical, hydrotechnical, tectonic, snow and ice, and geochemical processes that can pose a threat to worker and public safety, asset integrity, and asset management lifecycle cost. Like for most types of threats, the risks from geohazards can be assessed qualitatively or quantitatively and used to inform a geohazard management program. Most mining companies use risk matrices to aid in the assessment, prioritisation, communication and management of corporate risks. These matrices use standardised descriptions of likelihood and consequence to help users assess risks of negative outcomes to health, safety, the environment, assets, and reputation, and are tailored to each organisation’s types of risk exposure and level of risk tolerance. Geohazards and related geotechnical failures can represent low-probability, high-consequence events that plot in the highest risk zones of most corporate risk matrices. Variability in spatial and temporal probabilities for people and infrastructure exposed to geohazards can have a large influence on risk exposure, and this can be challenging to assess and communicate effectively with some risk matrices. Risk is scale-dependent: the business risk due to rockfall from a single slope along a mine access road is vastly different than the total risk due to rockfalls from all slopes along that road, yet guidance is often missing on how the risks from these scenarios should be plotted on a risk matrix. These and other pitfalls associated with use of corporate risk matrices for informed geohazard management are explored.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.139
metaresearch head score (Gemma)0.348
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.139
Threshold uncertainty score0.737

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.1390.348
Meta-epidemiology (narrow)0.0030.002
Meta-epidemiology (broad)0.0020.002
Bibliometrics0.0110.007
Science and technology studies0.0040.006
Scholarly communication0.0280.022
Open science0.0090.012
Research integrity0.0040.011
Insufficient payload (model declined to judge)0.0060.004

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.175
GPT teacher head0.445
Teacher spread0.271 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designTheoretical or conceptual
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations11
Published2019
Admission routes1
Has abstractyes

Explore more

Same topicOccupational Health and Safety ResearchFrench-language works237,207