MétaCan
Menu
Back to cohort
Record W2948541740 · doi:10.3390/w11061203

Effects of Short-Term Uncertainties on the Revenue Estimation of PPP Sewage Treatment Projects

2019· article· en· W2948541740 on OpenAlexafffund
Qian Liu, Zaiyi Liao, Qi Guo, Dagmawi Mulugeta Degefu, Song Wang, Feihong Jian

Bibliographic record

VenueWater · 2019
Typearticle
Languageen
FieldEconomics, Econometrics and Finance
TopicCapital Investment and Risk Analysis
Canadian institutionsToronto Metropolitan University
FundersNatural Sciences and Engineering Research Council of Canada
KeywordsSubsidyRevenueTerm (time)Government revenueEstimationEconomicsGovernment (linguistics)EconometricsMonte Carlo methodFinanceStatisticsMathematicsPhysics

Abstract

fetched live from OpenAlex

Many sewage treatment facilities in China have been developed and operated using the Public-Private Partnerships (PPP) model. However, a big challenge faced by these PPP projects is that the subsidy requested from the government during the operation is normally higher than what was estimated originally, thus often exceeding the budget that the government can afford. This leads to a high risk of project failure or insufficient operation. This problem is largely caused by the uncertainties exhibited in the existing models, such as the Black-Scholes (BS) model. While being used in the budget estimation, these models cannot sufficiently account for the short-term uncertainty that may be incurred during the operation of projects. In this study, a method to account for this short-term uncertainty has been proposed to improve the BS model. This allows for investigations to address issues related to how the real option value of a government subsidy is affected. A Monte Carlo simulation was performed to take into account the noise in the estimation. A sensitivity analysis further revealed that this discrepancy is largely affected by the values of the relevant parameters in the short-term uncertainty model. We found that the short-term uncertainty has a significant effect on private revenue and government subsidy and that the changes of the latter are more sensitive to the change of short-term uncertainty. The value of the relevant variables of short-term uncertainty determined the fluctuation of the revenue. The mean value and revenue had a positive correlation. The reverting speed and revenue showed a negative correlation. The short-term volatility had a positive correlation toward the fluctuation range of the revenue. The simulation results indicate that this enhanced method can produce more accurate information for a better assessment of the PPP project under a wide range of uncertainty scenarios, allowing for the best decision making by the government.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.846
Threshold uncertainty score0.303

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.021
GPT teacher head0.212
Teacher spread0.191 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations15
Published2019
Admission routes2
Has abstractyes

Explore more

Same venueWaterSame topicCapital Investment and Risk AnalysisFrench-language works237,207