MétaCan
Menu
Back to cohort
Record W2953985905 · doi:10.29173/mocs75

Smart Construction Site: Ontology of Information System Architecture

2019· article· en· W2953985905 on OpenAlexvenueno aff
Zakaria Dakhli, Thomas Danel, Zoubeir Lafhaj

Bibliographic record

VenueModular and Offsite Construction (MOC) Summit Proceedings · 2019
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsnot available
Fundersnot available
KeywordsComputer scienceArchitectureOntologyProcess (computing)Task (project management)Information systemSystems engineeringSoftware engineeringEngineering

Abstract

fetched live from OpenAlex

This paper provides a design of the Information System architecture to support a connected construction site. In order to master the diversity and the complexity of construction site processes, theories are needed that separate the stable essence of the smart construction site from the variable way in which it is realized and implemented. For that, construction site processes were mapped before linking each data path with the existing technological tools using correspondence matrixes. The results enable the definition of a proper system able to deal with the resources allocated to the construction process functionalities. The main challenge faced in this research was to identify which pertinent data is needed that activates the resources to complete each given construction task.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.003
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Methods · Consensus signal: Methods
Teacher disagreement score0.008
Threshold uncertainty score0.018

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0030.002
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0030.004
Science and technology studies0.0020.005
Scholarly communication0.0080.010
Open science0.0010.003
Research integrity0.0020.002
Insufficient payload (model declined to judge)0.0040.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.003
GPT teacher head0.156
Teacher spread0.154 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreMethods

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations7
Published2019
Admission routes1
Has abstractyes

Explore more

Same venueModular and Offsite Construction (MOC) Summit ProceedingsSame topicBIM and Construction IntegrationFrench-language works237,207