MétaCan
Menu
Back to cohort
Record W2954660414 · doi:10.29173/mocs102

Logistics Strategy for Industrialised House Building

2019· article· en· W2954660414 on OpenAlexvenueno aff
Duncan Maxwell, Martin Rudberg, Rachel Couper, Mathew Aitchison

Bibliographic record

VenueModular and Offsite Construction (MOC) Summit Proceedings · 2019
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsnot available
FundersAustralian Government
KeywordsSupply chainFlexibility (engineering)Product (mathematics)Process managementIntegrated logistics supportBusinessStandardizationOrder (exchange)Process (computing)UsabilityModularity (biology)Computer scienceManufacturing engineeringMarketingEngineeringEconomics

Abstract

fetched live from OpenAlex

Construction Logistics has recently emerged as an important consideration for Industrialized House Building (IHB). Previous research has demonstrated that construction logistics improves IHB through: the clarification of interfaces along the supply chain; increased supply chain efficiency; more productive construction sites; the transfer of value-adding activities from site to the supply chain; and the integration of site and supply chain. IHB research has commonly focused on buildings as product, their technical design and production, as well as the process of these activities. IHB companies seek the integration of these two aspects. However, there is growing realization of the value of integrating the supply chain through a focus on logistics. This paper argues that in order to achieve a tripartite integration of product, process, and logistics, that first an overarching company-level logistics strategy is required. A strategic perspective enables a separation of high-level logistics decisions from those that are operational in nature, in the same way that product platforms have assisted IHB. This separation is critical in overcoming the peculiarities of construction. This authors identify design-thinking as a powerful tool to assist in the future implementation of logistics strategy in order to drive the creation of contextually specific logistics solutions. Two company case studies from Sweden reveal two distinct forms of logistics strategy. These case studies, through comparative analysis, show how logistics strategies for IHB might emerge as design-led ‘logistics platforms’ that utilize the principles of standardization, modularity, and re-usability in order to achieve the flexibility demanded by construction. This paper proposes that a focus on IHB logistics strategy as a platform be implemented to allow effective integration of construction’s supply chain. The result of this approach is a re-usable, continually improving platform for construction logistics that can co-ordinate differing product and process approaches.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Other · Consensus signal: Other
Teacher disagreement score0.015
Threshold uncertainty score0.060

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.001
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0020.002
Scholarly communication0.0060.002
Open science0.0010.003
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0120.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.017
GPT teacher head0.218
Teacher spread0.201 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2019
Admission routes1
Has abstractyes

Explore more

Same venueModular and Offsite Construction (MOC) Summit ProceedingsSame topicBIM and Construction IntegrationFrench-language works237,207