MétaCan
Menu
Back to cohort
Record W2955648368 · doi:10.29173/mocs129

RFID-Integrated Software Platform for Construction Materials Management

2019· article· en· W2955648368 on OpenAlexvenueno aff
Safa Dardouri, Zakaria Dakhli, Andry Zaid Rabenantoandro, Zoubeir Lafhaj

Bibliographic record

VenueModular and Offsite Construction (MOC) Summit Proceedings · 2019
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsnot available
Fundersnot available
KeywordsGlobal Positioning SystemKanbanComputer scienceSystems engineeringSoftwareSystem integrationDatabaseTelecommunicationsEngineeringOperating system

Abstract

fetched live from OpenAlex

The intensity and rate of construction operations require logistics and transportation that can adapt to the changing nature of activities on a day-to-day basis of construction and that enable rapid decision-making. This paper aims to design an integrated RFID technology system for managing construction materials onsite. The integration includes managing materials during the front-end and the execution phases, managing the inventory, locating materials on site with Global Positioning System GPS, and developing Kanban systems for managing different stakeholders’ inputs onsite. The research also sheds the light into the effect of using RFID on leveraging valuable data. RFID systems can gather large amount of tag data via wireless connections.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.010
Threshold uncertainty score0.033

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.002
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0010.001
Science and technology studies0.0000.000
Scholarly communication0.0020.002
Open science0.0020.002
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0100.009

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.006
GPT teacher head0.182
Teacher spread0.176 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations4
Published2019
Admission routes1
Has abstractyes

Explore more

Same venueModular and Offsite Construction (MOC) Summit ProceedingsSame topicBIM and Construction IntegrationFrench-language works237,207