MétaCan
Menu
Back to cohort
Record W2960085298 · doi:10.1108/ci-06-2018-0052

BIM-based framework for temporary facility layout planning in construction site

2019· article· en· W2960085298 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.

Bibliographic record

VenueConstruction Innovation · 2019
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsÉcole de Technologie SupérieureUniversité du Québec à Montréal
Fundersnot available
KeywordsComputer scienceSolverProcess (computing)Page layoutBuilding information modelingData collectionIndustrial engineeringEngineering

Abstract

fetched live from OpenAlex

Purpose This paper aims to propose an innovative building information modelling (BIM)-based framework for multi-objective and dynamic temporary construction site layout design (SLD), which uses a hybrid approach of systematic layout planning (SLP) and mathematical modelling. Design/methodology/approach The hybrid approach, which follows a step-by-step process for site layout planning, is designed to facilitate both qualitative and quantitative data collection and processing. BIM platform is usedto facilitate the determination of the required quantitative data, while the qualitative data are generated through knowledge-based rules. Findings The multi-objective layout model represents two important aspects: layout cost and adjacency score. The result shows that the model meets construction managers’ requirements in not only saving cost but also assuring the preferences of temporary facility relationships. This implies that the integration of SLP and mathematical layout modelling is an appropriate approach to deliver practical multi-objective SLD solutions. Research limitations/implications The proposed framework is expected to serve as a solution, for practical application, which takes the advantage of technologies in data collection and processing. Besides, this paper demonstrates, by using numerical experimentation and applying Microsoft Excel Solver for site layout optimisation, how to reduce the complexity in mathematical programming for construction managers. Originality/value The original contribution of this paper is the attempt of developing a framework in which all data used for the site layout modelling are collected and processed using a systematic approach, instead of being predetermined, as in many previous studies.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.455
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.017
GPT teacher head0.245
Teacher spread0.228 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it