Benefits and Process Improvements for ERP Implementation: Results from an Exploratory Case Study
Bibliographic record
Abstract
This exploratory qualitative single case study discusses the benefits and process improvements pertinent to enterprise resource and planning (ERP) projects. The study was conducted in a Canadian case organization in the oil and gas industry that includes twenty participants from four project role groups of senior leaders, project managers, project team members, and business users. The results of the study revealed twenty-two key benefits and four process improvements from which organizations can draw value while planning for ERP projects. The top six benefits include: standardization of common business processes, single integrated system, standardized reporting, improved key performance indicators (KPI), all countries in one system, and easy access to data. Knowing and maximizing these key benefits may prove beneficial for organizations, while planning for major investments in ERP systems.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame machine prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.
Distilled classifier scores by category (both heads)
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.033 | 0.096 |
| Meta-epidemiology (narrow) | 0.001 | 0.001 |
| Meta-epidemiology (broad) | 0.000 | 0.001 |
| Bibliometrics | 0.002 | 0.002 |
| Science and technology studies | 0.005 | 0.003 |
| Scholarly communication | 0.004 | 0.004 |
| Open science | 0.002 | 0.003 |
| Research integrity | 0.002 | 0.002 |
| Insufficient payload (model declined to judge) | 0.003 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".