MétaCan
Menu
Back to cohort
Record W2970341368 · doi:10.1002/smr.2182

How has SPI changed in times of agile development? Results from a multi‐method study

2019· article· en· W2970341368 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.

Bibliographic record

VenueJournal of Software Evolution and Process · 2019
Typearticle
Languageen
FieldComputer Science
TopicSoftware Engineering Techniques and Practices
Canadian institutionsUniversity of Calgary
FundersEesti Teadusagentuur
KeywordsAgile software developmentScrumExtreme programmingExtreme programming practicesAgile usability engineeringContext (archaeology)User storyAgile Unified ProcessProcess (computing)Process managementLean software developmentSet (abstract data type)Computer scienceKnowledge managementEngineeringSoftware developmentSoftwareSoftware development processSoftware engineeringGeography

Abstract

fetched live from OpenAlex

Abstract The emergence of agile methods and practices has not only changed the development processes but might also have affected how companies conduct software process improvement (SPI). Through a set of complementary studies, we aim to understand how SPI has changed in times of agile software development. Specifically, we aim (a) to identify and characterize the set of publications that connect elements of agility to SPI, (b) to explore to which extent agile methods/practices have been used in the context of SPI, and (c) to understand whether the topics addressed in the literature are relevant and useful for industry professionals. To study these questions, we conducted an in‐depth analysis of the literature identified in a previous mapping study, an interview study, and an analysis of the responses given by industry professionals to SPI‐related questions stemming from an independently conducted survey study. Regarding the first question, we identified 55 publications that focus on both SPI and agility of which 48 present and discuss how agile methods/practices are used to steer SPI initiatives. Regarding the second question, we found that the two most frequently mentioned agile methods in the context of SPI are Scrum and Extreme Programming (XP), while the most frequently mentioned agile practices are integrate often , test‐first , daily meeting , pair programming , retrospective , on‐site customer , and product backlog . Regarding the third question, we found that a majority of the interviewed and surveyed industry professionals see SPI as a continuous activity. They agree with the agile SPI literature that agile methods/practices play an important role in SPI activities but that the importance given to specific agile methods/practices does not always coincide with the frequency with which these methods/practices are mentioned in the literature.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.001
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Methods · Consensus signal: none
Teacher disagreement score0.433
Threshold uncertainty score0.409

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.001
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.001
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.032
GPT teacher head0.293
Teacher spread0.261 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it