MétaCan
Menu
Back to cohort
Record W2971769178 · doi:10.2118/0919-0086-jpt

Innovative Design and Execution Lead to Successful Grand Banks Platform Operations

2019· article· en· W2971769178 on OpenAlexaboutno aff
Chris Carpenter

Bibliographic record

VenueJournal of Petroleum Technology · 2019
Typearticle
Languageen
FieldEngineering
TopicOffshore Engineering and Technologies
Canadian institutionsnot available
Fundersnot available
KeywordsEngineeringSubmarine pipelineDrillingBoomMarine engineeringMechanical engineeringEnvironmental engineering

Abstract

fetched live from OpenAlex

This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper OTC 28803, “Hebron Platform: Innovative Design and Efficient Execution,” by Widianto, Justin Chichester, Adel Younan, and Jameel Khalifa, ExxonMobil; Krishna Komperla, WorleyParsons; and Knut Bidne, Kvaerner, prepared for the 2018 Offshore Technology Conference, Houston, 30 April–3 May. The paper has not been peer reviewed. Copyright 2018 Offshore Technology Conference. Reproduced by permission. The Hebron platform was successfully installed on the Grand Banks offshore Newfoundland and Labrador in June 2017. It consists of a single-shaft concrete gravity-based structure (GBS) supporting an integrated drilling and production topsides. The design of the platform was challenged by sub-Arctic and extreme metocean conditions that required innovative design and layout approaches for many elements considered routine for typical platforms. This complete paper highlights the underlying technologies, analytical and design methods, and capital-efficient execution strategies employed. Introduction The Hebron platform comprises a GBS and topsides installed in 93-m water depth. Produced crude oil is stored in storage cells and pumped to shuttle tankers by an offshore loading system. The topsides facilities (operating weight 65,000 tonnes) include the following major modules: Utilities and process module (UPM) Derrick equipment set (DES) Drilling support module (DSM) Ancillaries (flare boom, east and west liftboat stations) Living quarters (LQ) designed to accommodate 220 personnel during steady-state operations The total height of the platform with GBS is approximately 235 m, topsides length is approximately 183 m, and the width is approximately 75 m. The GBS concept includes a single shaft supporting the topsides and encompasses all wells in the initial development. It is designed to withstand sea ice, icebergs, and other meteorological and oceanographic conditions at the offshore Hebron site. The GBS is designed for an in-service life of 50 or more years to support future developments. The lower portion of the GBS up to an elevation of approximately 27 m was constructed in a drydock created by building a bund wall and dewatering the site behind it. Subsequently, the dock was flooded, the bund wall was removed, and the GBS base was towed approximately 3 km to a deepwater site. The floating GBS was held in place with mooring lines while the remaining construction was completed. All walls were constructed using the slip-forming technique. The topsides structure was fabricated in modules at various locations in Newfoundland and Labrador and South Korea. Two of the topsides modules, UPM and DES, were fabricated in South Korea using block/pancake construction methods (Fig. 1). After UPM and DES fabrication was completed, the modules were loaded out separately to heavy vessels for transportation to Bull Arm, Newfoundland and Labrador. All other topsides modules were integrated with the main UPM module at the finger pier in Bull Arm and the completed topsides structure was mated with the GBS while floating at the deepwater site. The mated platform then was towed offshore and installed at the final offshore location.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.508
Threshold uncertainty score0.510

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.212
Teacher spread0.204 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2019
Admission routes1
Has abstractyes

Explore more

Same venueJournal of Petroleum TechnologySame topicOffshore Engineering and TechnologiesFrench-language works237,207