Construction contracts recognize an owner’s right to terminate a contract before project completion without rendering the action a breach of contract. This chapter describes two types of termination by an owner: termination for default and termination for convenience. It summarizes the background issues relating to each termination scenario; grounds for termination by the owner; practical considerations upon receipt of a termination notice; contractor liabilities and risks; and contractor remedies, recovery, and appeal rights. The termination for convenience clause gives the owner a unilateral right to terminate a contract before completion without regard to the contractor’s performance. Once unique to federal contracts, variations on the federal model are now commonly found in local and state government contracts and in private contracts. Federal contracts grant the government the exclusive right to terminate a contract, either for default or for convenience.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame machine prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.
Distilled classifier scores by category (both heads)
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.006 | 0.016 |
| Meta-epidemiology (narrow) | 0.001 | 0.001 |
| Meta-epidemiology (broad) | 0.001 | 0.001 |
| Bibliometrics | 0.002 | 0.003 |
| Science and technology studies | 0.004 | 0.007 |
| Scholarly communication | 0.009 | 0.007 |
| Open science | 0.002 | 0.005 |
| Research integrity | 0.004 | 0.005 |
| Insufficient payload (model declined to judge) | 0.029 | 0.008 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".