MétaCan
Menu
Back to cohort

Comparison of technological losses of 6 (10) kV and 20 kV electrical network.

2019· article· en· W2993111363 on OpenAlex
Avy Sheina, S. SKRYPNYK

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

aboutThe title or abstract carries a Canadian signal from the geographic lexicon.
no affNo Canadian affiliation: this work is invisible to an affiliation-only frame.
No Canadian affiliation. An affiliation-only frame, the usual design, would never have seen this work. It is one of the works that make the case for inverting the frame.

Bibliographic record

VenueJournal of Electrical and power engineering · 2019
Typearticle
Languageen
FieldEnvironmental Science
TopicEnvironmental and Industrial Safety
Canadian institutionsnot available
Fundersnot available
KeywordsElectricityEconomic shortageEnvironmental economicsCommissionBusinessElectric potential energyOrder (exchange)Distribution (mathematics)Reliability (semiconductor)Electric powerCommercePower (physics)Industrial organizationEconomicsElectrical engineeringEngineeringFinance

Abstract

fetched live from OpenAlex

In the electricity networks of Ukraine the share of technological losses of electric networks with the three-stage 110-35-6 system (10) reaches up to 12-14%, the National Commission of Ukraine, which carries out regulation in the sphere of energy and utilities) tries to solve by means of the transition to the increased voltage of 20 kV and transition from three-stage system to two-stage. In the new economic environment, due to the limited energy resources in Ukraine and the privatization of certain energy facilities, electricity losses have become one of the levers of controlling the economic efficiency of energy companies. Among the facilities where there is excessive power and electricity losses, the distribution grids have not received much attention before. More important in them was the provision of the necessary level of reliability of electricity supply to consumers. In addition, the network data were not structurally adapted to optimal control, since they did not have any means of tele-information about the parameters of the current mode or the means of controlling the latter. The level of energy consumption, economical use of electricity is one of the determining factors in the economy of any country. Too many countries where there is an acute shortage of energy. The increased level of electricity losses during its transportation and distribution is caused by a number of reasons. Modern electrical networks in our country are characterized by: - high design current density of approximately 1 A / mm2 versus 0.4-0.6 A / mm2 in the developed countries of the West; - high level of heterogeneity, since this parameter was practically disregarded in the design standards; - a low level of reactive power compensation of approximately 0.3 kVA / kW of installed power against 0.8-1.0 kVA/ kW in the USA and Canada; - insufficient use of transformers with tap changers, so tap changers are practically not used in automatic mode, whereas the increase of transformer cost due to tap changers is 30-40%. The main technological losses of electricity in the grids are: 1) load losses in the wires of transmission lines (transmission lines) and windings of power transformers of substations; 2) loss of iron in transformer cores during idle; 3) losses on the crown of the power lines; 4) loss of own resources; 5) losses in compensation devices (capacitor batteries, synchronous compensators, static thyristor compensators, etc.); Measures to reduce network losses should be chosen on the basis of the principle of minimizing the above costs while fulfilling the conditions for reliability of electricity supply and quality of electricity. From the above, it is concluded that reducing the number of links in the grid will lead to a reduction in technological losses. After the calculations it is possible to notice that the total losses of the system of the 3-stage system will be equal to 37512 kWh, and for the 2-stage system 25560 kWh. Thus, the losses in the transformers of the 2-stage 110-20 kVelectric network are 32% less than the 3-stage 110-35-10 (6) kV, which confirms the economy and efficiency of the transition to the increased 20 kV disturbance in our country

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.171
Threshold uncertainty score0.535

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.214
Teacher spread0.207 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it