Construction and resource short-term planning using a BIM-based ontological decision support system
Bibliographic record
Abstract
The dynamic nature and increasing complexity of the construction projects impose many challenges for project planning and control. As a project progresses, more information becomes available and the level of uncertainty decreases. It can be used to proactively check the validity of the previous decisions and develop revised and more detailed plans for the upcoming activities in construction planning meetings. For this purpose, this study implements ontological knowledge representation and semantic reasoning techniques to propose an intelligent information collection and decision support system framework for short-term collaborative construction and resource planning. Moreover, a new approach is suggested that allows for incorporating resource specifications and limitations, and complex multi-factor constraints in the ontological planning process. The framework was tested based on a real-world construction project and different application cases were discussed. The framework showed a promising performance for analyzing different scenarios and help the planners making informative decisions.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".