MétaCan
Menu
Back to cohort
Record W3012349450 · doi:10.1007/s11081-020-09495-x

Joint stochastic short-term production scheduling and fleet management optimization for mining complexes

2020· article· en· W3012349450 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.
fundA Canadian funder is recorded on the work.

Bibliographic record

VenueOptimization and Engineering · 2020
Typearticle
Languageen
FieldEngineering
TopicMining Techniques and Economics
Canadian institutionsMcGill University
FundersAngloGold AshantiNatural Sciences and Engineering Research Council of CanadaNewmont CorporationIAMGOLDCanada Research ChairsMcGill UniversityBarrick Gold Corporation
KeywordsHaulageRelocationShovelTruckComputer scienceFleet managementScheduling (production processes)ScheduleOpen-pit miningMetaheuristicTime horizonOperations researchProduction scheduleProduction (economics)Mathematical optimizationEngineeringRopeAutomotive engineeringAlgorithmMathematicsMining engineering

Abstract

fetched live from OpenAlex

Abstract This article presents a novel stochastic optimization model that simultaneously optimizes the short-term extraction sequence, shovel relocation, scheduling of a heterogeneous hauling fleet, and downstream allocation of extracted materials in open-pit mining complexes. The proposed stochastic optimization formulation considers geological uncertainty in addition to uncertainty related to equipment performances and truck cycle times. The method is applied at a real-world mining complex, stressing the benefits of optimizing the short-term production schedule and fleet management simultaneously. Compared to a conventional two-step approach, where the production schedule is optimized first before optimizing the allocation of the mining fleet, the costs generated by shovel movements are reduced by 56% and lost production due to shovel relocation is cut by 54%. Furthermore, the required number of trucks shows a more balanced profile, reducing total truck operational costs by 3.1% over an annual planning horizon, as well as the required haulage capacity in the most haulage-intense periods by 25%. A metaheuristic solution method is utilized to solve the large optimization problem in a reasonable timespan.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Methods · Consensus signal: Methods
Teacher disagreement score0.386
Threshold uncertainty score0.652

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.025
GPT teacher head0.207
Teacher spread0.181 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it