MétaCan
Menu
Back to cohort
Record W3021080851 · doi:10.3390/a13050115

A Fuzzy-Based Decision Support Model for Risk Maturity Evaluation of Construction Organizations

2020· article· en· W3021080851 on OpenAlexaffabout
Mohammadjavad Arabpour Roghabadi, Osama Moselhi

Bibliographic record

VenueAlgorithms · 2020
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsConcordia University
Fundersnot available
KeywordsCapability Maturity ModelMaturity (psychological)InterdependenceAmbiguityRisk managementRisk analysis (engineering)Process (computing)Identification (biology)Computer scienceQuality (philosophy)Process managementFuzzy logicService Integration Maturity ModelSet (abstract data type)BusinessArtificial intelligence

Abstract

fetched live from OpenAlex

Risk maturity evaluation is an efficient tool which can assist construction organizations in the identification of their strengths and weaknesses in risk management processes and in taking necessary actions for the improvement of these processes. The accuracy of its results relies heavily on the quality of responses provided by participants specialized in these processes across the organization. Risk maturity models reported in the literature gave equal importance to participants’ responses during the model development, neglecting their level of authority in the organization as well as their level of expertise in risk management processes. Unlike the existing models, this paper presents a new risk maturity model that considers the relative importance of the responses provided by the participants in the model development. It considered their authority in the organization and their level of involvement in the risk management processes for calculating the relative weights associated with the risk maturity attributes. It employed an analytic network process (ANP) to model the interdependencies among the risk maturity attributes and utilizes the fuzzy set theory to incorporate the uncertainty associated with the ambiguity of the responses used in the model development. The developed model allows the construction organizations to have a more accurate and realistic view of their current performance in risk management processes. The application of the developed model was investigated by measuring the risk maturity level of an industrial partner working on civil infrastructure projects in Canada.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.003
metaresearch head score (Gemma)0.006
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Methods · Consensus signal: Methods
Teacher disagreement score0.018
Threshold uncertainty score0.036

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0030.006
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0020.001
Science and technology studies0.0010.001
Scholarly communication0.0030.002
Open science0.0020.001
Research integrity0.0020.002
Insufficient payload (model declined to judge)0.0040.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.125
GPT teacher head0.383
Teacher spread0.258 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreMethods

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations14
Published2020
Admission routes2
Has abstractyes

Explore more

Same venueAlgorithmsSame topicConstruction Project Management and PerformanceFrench-language works237,207