MétaCan
Menu
Back to cohort
Record W3021152059 · doi:10.2478/otmcj-2020-0005

Qualitative analysis of Request For Information to identify design flaws in steel construction projects

2020· article· en· W3021152059 on OpenAlexaff
Mathieu Fokwa Soh, Daniel Barbeau, Sylvie Doré, Daniel Forgues

Bibliographic record

VenueOrganization Technology and Management in Construction An International Journal · 2020
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsÉcole de Technologie Supérieure
Fundersnot available
KeywordsComputer scienceContext (archaeology)Process (computing)Construction engineeringImplementationPhase (matter)Construction managementRisk analysis (engineering)EngineeringSoftware engineeringCivil engineeringBusiness

Abstract

fetched live from OpenAlex

Abstract Request for information (RFI) is a formal process used in the Architecture, Engineering and Construction industry to address design flaws that affect communication between designers and contractors. A large number of RFIs are a sign of a lack of precision or coordination in the design documents. However, RFIs produce rich, precise, and structured information. Analyzing their content can help to identify recurring problems between designers and construction teams and better tailor future projects to the working context of the contractors. This article presents a method for identifying recurring issues during the design phase of steel construction projects through the analysis of the contents of RFIs. It is original in using a qualitative content analysis tool that can analyze large quantities of RFIs rapidly. Identifying the recurrent problems of contractors will allow the establishment of rules to be taken into consideration during the design phase of future steel construction projects. A case study of 26 steel construction projects demonstrates the feasibility of this method. This case study shows that, given the same designers and construction teams, recurring problems shown in RFIs do not differ according to the scale of the projects. In this case, the main issue between designers and contractors is the lack and inadequate presentation of information related to the connection of steel components. Identifying these problems can pave the way for initiatives to improve the design phase and can be an essential step in making contractors’ knowledge available to designers early in the projects.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.700
Threshold uncertainty score0.507

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0030.003
Science and technology studies0.0000.000
Scholarly communication0.0000.001
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.022
GPT teacher head0.313
Teacher spread0.291 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designTheoretical or conceptual
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations8
Published2020
Admission routes1
Has abstractyes

Explore more

Same venueOrganization Technology and Management in Construction An International JournalSame topicBIM and Construction IntegrationFrench-language works237,207