MétaCan
Menu
Back to cohort
Record W3036245496 · doi:10.5430/rwe.v11n3p59

Identification Factors Affecting Variation and Change Order of Design-Build Projects

2020· article· en· W3036245496 on OpenAlexvenueno aff
Phong Thanh Nguyen, Hanh Thi Hong Nguyen

Bibliographic record

VenueResearch in World Economy · 2020
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsnot available
FundersViet Nam National University Ho Chi Minh CityHo Chi Minh City University of Technology and Education
KeywordsChange orderVariation (astronomy)Scope (computer science)ScheduleOrder (exchange)Identification (biology)Project managementProcess (computing)Process managementInvestment (military)Quality (philosophy)Computer scienceRisk analysis (engineering)BusinessOperations managementProject planningSystems engineeringEngineeringProject charterPolitical science

Abstract

fetched live from OpenAlex

Variations and change orders are inevitable in the course of implementing a construction investment project. It can appear throughout the project from the design phase to the construction, acceptance, and completion of the project. This change affects more or less the schedule, quality, and cost of the project. On the other hand, variations and changes orders may also cause disputes and conflicts among project stakeholders. In order to overcome this issue, this paper presents critical the factors which need to be addressed and used for change orders in design-build projects in Vietnam. The results showed that written instructions, variation value, and scope of variation are the three most important factors used in the variation management process in design-build projects in Vietnam.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.005
metaresearch head score (Gemma)0.001
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.145
Threshold uncertainty score0.281

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0050.001
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.003
Science and technology studies0.0000.000
Scholarly communication0.0000.001
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.481
GPT teacher head0.455
Teacher spread0.026 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2020
Admission routes1
Has abstractyes

Explore more

Same venueResearch in World EconomySame topicConstruction Project Management and PerformanceFrench-language works237,207