Bibliographic record
Abstract
The needs of expeditionary forces involve the use of light-weight, short-span bridges so that their transport by air would be possible. A project which is currently developed in USA aims at the elaboration of a Composite Army Bridge (CAB) assault bridge and a Modular Composite Bridge – MCB logistic bridge. In 2004 CAB successfully underwent fatigue tests. A 14 m-long, all-composite treadway bridge span was loaded by using an MLC 100 vehicle and it withstood 20 000 load cycles. The MCB will be constructed by7 m of box modules and a 6.5 m access ramp. A 26 m-long and 4 m-wide bridge span is to provide the traffic ability of MLC 65. Furthermore, works on a 10 m-long, MLC 30 composite bridge are also developed in Canada too. The paper also presents the American concept of employing a deployable bridge system by utilising a composite structure. In order to formwork and reinforce the plate, fibre reinforced polyester composites (FRP) were used. The girder construction is made of aluminium pipes forming diamond truss with curved bottom chord. After they are integrated in the structure, the top chord nodes are connected through deck plate cast in-situ. The tests indicated that there exists the possibility of using polymer composites in military bridge construction and mobile structures of composite bridges.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".