MétaCan
Menu
Back to cohort
Record W3103483807 · doi:10.18280/ijsdp.150709

Implementation of Value Engineering in Optimizing Project Cost for Sustainable Energy Infrastructure Asset Development

2020· article· en· W3103483807 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

venuePublished in a venue whose home country is Canada.
no affNo Canadian affiliation: this work is invisible to an affiliation-only frame.
No Canadian affiliation. An affiliation-only frame, the usual design, would never have seen this work. It is one of the works that make the case for inverting the frame.

Bibliographic record

VenueInternational Journal of Sustainable Development and Planning · 2020
Typearticle
Languageen
FieldBusiness, Management and Accounting
TopicValue Engineering and Management
Canadian institutionsnot available
Fundersnot available
KeywordsValue engineeringCeiling (cloud)Asset (computer security)Quality (philosophy)Architectural engineeringComputer scienceOperations managementConstruction engineeringEngineering

Abstract

fetched live from OpenAlex

The purpose of this study is to optimize costs by analyzing a case study of the Energy Utility Company (EUC) project in Malaysia and building the main electric distribution station (MEDS) project specifically. In order to achieve this objective, Value Engineering (VE) technique as one of the proven tools was selected, and three alternatives were applied. The first alternative was to reduce the room sizes of the building. The second alternative was to replace the plaster painting with normal painting, and the last one was to replace painting up to 1.5 meters with 1 meter of the high of walls from the floor. Results approved that the implementation of VE has successfully reduced the cost of the project without compromising the quality of the materials. For the first alternative, 17.1% of the cost was saved. Regarding the second alternative, 69.8% of the total cost for ceiling painting was saved, and for the third alternative, 41.6% of the total cost of walls from the floor was saved. The findings of this research may serve as a guide for engineers, scholars, and constructors to reduce the cost of the building project.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.780
Threshold uncertainty score0.654

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.000
Science and technology studies0.0000.000
Scholarly communication0.0000.001
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.013
GPT teacher head0.250
Teacher spread0.237 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it