Application of Collaborative Management NEC and DAB to ImproveCommunication and Integration in Multi-Family Building Projects.
Bibliographic record
Abstract
After the success of the Project for the Pan American Games in Peru, the mechanisms adopted by the organization to achieve the objectives proposed in the Project were made known to society. This research is based on adopting the NEC collaborative methodology mainly in the management of Stakeholders. For this reason, it is proposed to solve the problem of lack of communication and integration of Involved in Multifamily building projects, from the information collected about Collaborative Management NEC is made: (1) Analysis and evaluation of Involved. (2) Characteristics and strategies are proposed to manage Stakeholders. Likewise, (3) an analysis of the Dispute Resolution Board (DAB) is carried out and (4) the application of the ICE meetings tool is proposed to guarantee the correct flow of information in the project.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.001 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".