MétaCan
Menu
Back to cohort
Record W3116734168 · doi:10.3390/app10249045

Development of a Preliminary-Risk-Based Flood Management Approach to Address the Spatiotemporal Distribution of Risk under the Kaldor–Hicks Compensation Principle

2020· article· en· W3116734168 on OpenAlexaff
Muhammad Atiq Ur Rehman Tariq, Rashid Farooq, Nick van de Giesen

Bibliographic record

VenueApplied Sciences · 2020
Typearticle
Languageen
FieldEnvironmental Science
TopicFlood Risk Assessment and Management
Canadian institutionsLakehead University
Fundersnot available
KeywordsFlood mythRisk managementReturn periodRisk analysis (engineering)FloodplainFlood risk managementEnvironmental economicsActuarial scienceComputer scienceOperations researchEnvironmental resource managementBusinessEconomicsEngineeringGeographyFinance

Abstract

fetched live from OpenAlex

All over the world, probability-based flood protection designs are the ones most commonly used. Different return-period design floods are standard criteria for designing structural measures. Recently, risk-based flood management has received a significant appraisal, but the fixed return period is still the de facto standard for flood management designs due to the absence of a robust framework for risk-based flood management. The objective of this paper is to discuss the economics and criteria of project appraisal, as well as to recommend the most suitable approach for a risk-based project feasibility evaluation. When it comes to flood management, decision-makers, who are generally politicians, have to prioritize the allocation of resources to different civic welfare projects. This research provides a connection between engineering, economics, and management. Taking account of socioeconomic and environmental constraints, several measures can be employed in a floodplain. The Kaldor–Hicks compensation principle provides the basis for a risk-based feasibility analysis. Floods should be managed in a way that reduces the damage from minimum investments to ensure maximum output from floodplain land use. Specifically, marginal losses due to flood damage and the expense of flood management must be minimized. This point of minimum expenses is known as the “optimum risk point” or “optimal state”. This optimal state can be estimated using a risk-based assessment. Internal rate of return, net present value, and benefit–cost ratio are indicators that describe the feasibility of a project. However, considering expected annual damage is strongly recommended for flood management to ensure a simultaneous envisage of the performance of land-use practices and flood measures. Flood management ratios can be used to describe the current ratio of expected annual damage to the expected annual damage at the optimal risk point. Further development of the approach may replace probability-based standards at the national level.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.004
metaresearch head score (Gemma)0.004
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: none
GenreCandidate signal: Methods · Consensus signal: Methods
Teacher disagreement score0.007
Threshold uncertainty score0.023

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0040.004
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.002
Bibliometrics0.0020.001
Science and technology studies0.0010.001
Scholarly communication0.0030.003
Open science0.0030.003
Research integrity0.0020.002
Insufficient payload (model declined to judge)0.0070.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.026
GPT teacher head0.248
Teacher spread0.222 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designTheoretical or conceptual
Domainnot available
GenreMethods

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations6
Published2020
Admission routes1
Has abstractyes

Explore more

Same venueApplied SciencesSame topicFlood Risk Assessment and ManagementFrench-language works237,207