MétaCan
Menu
Back to cohort
Record W3122001505 · doi:10.1115/ipc2020-9675

Preserving Critical Stormwater Storage Assets at Pipeline Terminal

2020· article· en· W3122001505 on OpenAlexaboutno aff
Vincent Huang, David Walter, Curtis R. Treen, John A. Richmond

Bibliographic record

VenueVolume 3: Operations, Monitoring, and Maintenance; Materials and Joining · 2020
Typearticle
Languageen
FieldEngineering
TopicGrouting, Rheology, and Soil Mechanics
Canadian institutionsnot available
Fundersnot available
KeywordsStormwaterLandslideExcavationRetention basinDrainageRemedial actionEnvironmental scienceWater storageGeotechnical engineeringHydropowerCivil engineeringHydrology (agriculture)GeologyEngineeringSurface runoffEnvironmental remediationContamination

Abstract

fetched live from OpenAlex

Abstract A slope failure compromised the integrity of a critical stormwater storage facility at a petroleum storage terminal within northern Alberta. Through periodic ground inspections and a review of LiDAR and aerial imagery, significant lateral deformation of a lined stormwater pond was identified. The potential for pond overflow and uncontrolled stormwater release into the natural environment due to compromised discharge outlets and liner integrity posed an operational and environmental risk. A fast-tracked review and assessment of both the historical and as-built construction details, a good understanding of the regional geology, and geotechnical investigation and instrumentation were required to identify remedial measures that could be implemented to restore the pond prior to the onset of major storm events. Geotechnical investigation and assessment showed weak zones in the bedrock at shallower depths than were historically encountered at the site. Spatial constraints, uncontrolled fill placement in close proximity to the pond, expansion of the pond following original construction, and compromised subsurface drainage were identified as factors that may have contributed to the failure. Assessment of remedial options considered impacts relative to both local and global factors of safety. The selected remedial option was a combination of slope unloading, shear key construction, and improved drainage with the design and construction occurring within a timeframe of 3 months to minimize the time that the pond was out of service. The paper highlights the challenges associated with the slope unloading and shear key construction that were required to control the ground movements. An approach involving sequential excavation and replacement was adopted to manage the risks associated with shear key construction. In addition, directional drill methods were incorporated to install some of the drainage measures due to the risk associated with an open cut approach. The project was fast-tracked to minimize exposure to high precipitation and limited stormwater storage capacity.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.723
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.018
GPT teacher head0.237
Teacher spread0.220 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2020
Admission routes1
Has abstractyes

Explore more

Same venueVolume 3: Operations, Monitoring, and Maintenance; Materials and JoiningSame topicGrouting, Rheology, and Soil MechanicsFrench-language works237,207