Living with Legacy Risk—The Limits of Practicalities?
Bibliographic record
Abstract
Legacy risks from infrastructures and industrial installations often reveal themselves when a potential for failure has been discovered much later than at the stage of the design and construction of a structure. In which case, there might already be a problem with the legacy installation, or even a crisis, without having had an accident. When the hazard cannot be taken away, the question arises as to how much effort, if any, should be spent on improving the situation. The usefulness of the three archetypical approaches to this problem: setting a standard, the as low as reasonably practicable approach and a case-by-case discourse approach are discussed for their applicability for these legacy risks. Although it would be desirable to retrofit legacy risks to previously set legal requirements as is the case when acceptability limits are set in law or demonstration of ALARP (As Low As Reasonably Achievable) is demanded, it may be impossible to reduce the residual risk to an otherwise acceptable level without taking away or replacing the infrastructure, which is not acceptable either. Therefore in conclusion the only available solution to persistent legacy risk problems seems to be to have a thorough discussion with all relevant stakeholders until an agreement is in some way found.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.002 | 0.006 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.001 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.001 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".