MétaCan
Menu
Back to cohort
Record W3134980831 · doi:10.3390/jrfm14030092

Engineering Procurement Construction in the Context of Belt and Road Infrastructure Projects in West Asia: A SWOT Analysis

2021· article· en· W3134980831 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

venuePublished in a venue whose home country is Canada.
no affNo Canadian affiliation: this work is invisible to an affiliation-only frame.
No Canadian affiliation. An affiliation-only frame, the usual design, would never have seen this work. It is one of the works that make the case for inverting the frame.

Bibliographic record

VenueJournal of risk and financial management · 2021
Typearticle
Languageen
FieldBusiness, Management and Accounting
TopicPublic-Private Partnership Projects
Canadian institutionsnot available
Fundersnot available
KeywordsSWOT analysisBusinessProcurementChinaCritical infrastructureProject managementContext (archaeology)Process managementEngineeringMarketingPolitical scienceGeography

Abstract

fetched live from OpenAlex

Engineering procurement and construction (EPC) is a normative practice globally approved since China has been engaging in international cooperation under the Belt and Road Initiative (BRI) infrastructure development. EPC has been adopted in the delivery of BRI infrastructure projects in other countries. Compared to the domestic method of contract, EPC remains at a low level in management practice, such as a lack of coordinating diverse project stakeholders, high cost of information communication, and risk in complex environments in West Asia (WA). However, no research has conducted a strategic analysis of the current situation of EPC for BRI infrastructure projects in West Asian countries. This study aims to understand the current status quo of EPC for BRI projects in WA by performing a strength, weakness, opportunity, and threats (SWOT) analysis and with the support of data collected from the literature review and semi-structured interviews with EPC stakeholders. The study brings awareness along which internally and externally circumstances of the EPC for BRI infrastructure projects can be perceived by major stakeholders participating. The four critical strategies presented based on the SWOTs identified could help EPC firms develop and promote EPC to implement BRI infrastructure projects in WA at the strategic level.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.170
Threshold uncertainty score0.438

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.002
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.205
Teacher spread0.197 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it