MétaCan
Menu
← Back to cohort
Record W3136940997 · doi:10.5194/egusphere-egu21-8897

A Continuous Data Production Approach to Flow Estimation in Canada

2021· article· en· W3136940997 on OpenAlexaffabout
François Rainville, Alain Pietroniro, André Bouchard, Amber Brown, Douglas Stiff

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEnvironmental Science
TopicHydrology and Watershed Management Studies
Canadian institutionsUniversity of CalgaryCanadian Hydrographic Service
Fundersnot available
KeywordsEnvironmental sciencePrecipitationProduction (economics)SnowpackClimate changeSnowResource (disambiguation)Service (business)Environmental resource managementHydrology (agriculture)BusinessComputer scienceMeteorologyGeographyEngineeringEcologyEconomics

Abstract

fetched live from OpenAlex

The world has entered an era of immense water-related threats due to climate warming and human actions. Changing precipitation patterns, reducing snowpack, accelerating glacial melt, intensifying floods and droughts have made the need for timely hydrometric information indispensable. Climate change thus introduced requirements for adaptive management and timely water resource information at the municipal, regional and national levels. Over the last 10 years, it became evident that demands from users had moved towards best available hydrometric data in near real-time. As with most hydrometric services around the world, the WSC was a legacy and archive-driven organization that published approved data on an annual basis. Real-time data was an after-thought simply equated with the application of rating curves onto telemetry water levels, while hydrographers remained focused on approving data months after the facts. To address this challenge, the Meteorological Service of Canada‘s National Hydrological Services, and specifically the Water Survey of Canada (WSC) has developed a near real-time continuous data production system to meet the evolving needs of stakeholders. To meet this challenge, WSC developed solutions where data would be improved as field-measurements were being acquired. Corrections to data and rating curves are applied within hours of field discharge measurements, allowing for near-real time publication of corrected discharge information. Moreover, station conditions and performance are constantly monitored with “eyes-on-data” production tools that allow the program to optimize its field visits, costs and data publication. These tools were developed in-house to enable effective network time-management while communicating important information with partner agencies. This was made possible with a cloud-based hydrometric data production system and modern telecommunications tools. As a result of this work, the improved near real-time data became the catalyst to revamp a multi-decade approach to final data approval. This improved overall efficiency and is now leading to less delays in the approved data production cycle. This paper describes the design and implementation of the continuous data production system adopted at WSC and highlights some of the benefits noted since program implementation. This paper also identifies future investments that could help the sustainability of this new system in the long term.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.009
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.030
Threshold uncertainty score0.215

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0020.009
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0040.008
Science and technology studies0.0020.001
Scholarly communication0.0050.002
Open science0.0020.002
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0070.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.018
GPT teacher head0.211
Teacher spread0.193 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2021
Admission routes2
Has abstractyes

Explore more

Same topicHydrology and Watershed Management Studies→French-language works237,207→