Lot-sizing Within Capacity-Constrained Manufacturing Systems Using Time-phased Planning
Why this work is in the frame
A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.
Bibliographic record
Abstract
Research on lot sizing has mostly assumed single echelon systems. Even when multiple echelon systems have been used, capacity constraints are seldom considered. However, in manufacturing capacity constraints can lead to significant queuing effects. Commonly used lot sizing policies like lot-for-lot (LFL) and period order quantity (POQ) do not take these effects into account. This research compares these policies with a fixed order quantity (FOQ) policy, within which lot sizes are based on minimizing estimated lot flowtimes at capacity-constrained machines. Simulation is used to study a small production and distribution network using time-phased planning. Results show that the FOQ policy performs better than both LFL and POQ when inventory levels and delivery performance are of concern
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it