MétaCan
Menu
Back to cohort
Record W3143029027 · doi:10.2307/25148759

Knowledge Integration and Information Technology Project Performance1

2006· article· en· W3143029027 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.

Bibliographic record

VenueMIS Quarterly · 2006
Typearticle
Languageen
FieldBusiness, Management and Accounting
TopicERP Systems Implementation and Impact
Canadian institutionsUniversity of Calgary
Fundersnot available
KeywordsKnowledge managementInformation technologyBusinessInformation systemProcess managementComputer scienceEngineering managementEngineering

Abstract

fetched live from OpenAlex

Successful product and process design depends on management’s ability to integrate fragmented pockets of specialized knowledge. This integrative capability has important implications for large-scale information technology projects. This article examines the relationship between timely project completion and two dimensions of management’s integrative capability: access to external knowledge and internal knowledge integration. Measures of these two dimensions are used to predict on-time project completion, where completion is a function of the duration of IT-related project delays. In a longitudinal study of 74 enterprise application integration projects in the medical sector, integrative capability was measured from the point of view of the CIO and a facility IT manager. Accounting for several project controls, our Cox regression results indicate both integrative dimensions significantly mitigate the duration of IT-related project delays, thus promoting timely project completion. The analysis also reveals the importance of taking management structure into consideration when studying IT phenomena in networked organizations.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.807
Threshold uncertainty score0.454

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.000
Science and technology studies0.0000.000
Scholarly communication0.0000.003
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.013
GPT teacher head0.257
Teacher spread0.244 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it