MétaCan
Menu
Back to cohort
Record W3155016304 · doi:10.1109/tpwrs.2021.3072341

Incorporating Multi-Year Asset Replacement Time Into Calculation of Asset's Expected Annual Unavailability Due to End-of-Life Failure

2021· article· en· W3155016304 on OpenAlexaffabout
Miodrag Kandic, Ioni Fernando, A.M. Gole, Liqun Wang

Bibliographic record

VenueIEEE Transactions on Power Systems · 2021
Typearticle
Languageen
FieldEngineering
TopicPower System Reliability and Maintenance
Canadian institutionsUniversity of ManitobaManitoba Hydro
Fundersnot available
KeywordsUnavailabilityReliability engineeringAsset (computer security)Investment (military)Probabilistic logicRisk analysis (engineering)Asset managementEngineeringComputer scienceActuarial scienceEconomicsBusinessFinance

Abstract

fetched live from OpenAlex

Aging asset management requires careful consideration of end-of-life of any asset. This is particularly serious with aging infrastructure which may require complete replacement of a large asset which has a long lead time. In many current End-of-Life analysis approaches to calculate unavailability, the period of interest is sub-divided into yearly cycles with the assumption that the asset is available at the start of the year. Although this assumption is adequate if the replacement time for the asset occurs within the year, with longer lead times this can create excessively optimistic availabilities. This paper presents an improved probabilistic tool for risk assessment due to End-of-Life failure unavailability which overcomes this deficiency. The End-of-Life methodology proposed in this paper is required when aging assets have long lead times to replacement and so the capital investment decision must be made several years ahead. The method is applied to evaluate the End-of-Life unavailability of Manitoba Hydro Bipole II HVdc converters. The results are corroborated using Monte Carlo simulation. Finally, the risk of End-of-Life is incorporated into an economic cost-benefit analysis corresponding to the presented unavailability evaluation method.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.785
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0010.000
Bibliometrics0.0000.001
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.009
GPT teacher head0.229
Teacher spread0.219 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2021
Admission routes2
Has abstractyes

Explore more

Same venueIEEE Transactions on Power SystemsSame topicPower System Reliability and MaintenanceFrench-language works237,207