MétaCan
Menu
Back to cohort
Record W3155372619 · doi:10.32722/cmj.v3i1.3506

PERBANDINGAN METODE KONVENSIONAL DENGAN BIM TERHADAP EFISIENSI BIAYA, MUTU, WAKTU

2021· article· id· W3155372619 on OpenAlexaff
Rizal Maulana Rizqy, Nunung Martina, Hari Purwanto

Bibliographic record

VenueConstruction and Material Journal · 2021
Typearticle
Languageid
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsEncana (Canada)
Fundersnot available
KeywordsHumanitiesPhysicsArt

Abstract

fetched live from OpenAlex

Perkembangan dunia konstruksi yang sudah sangat pesat di Indonesia terbukti dengan adanya metode baru untuk konstruksi yaitu Building Information Modelling (BIM). Munculnya BIM ini diklaim dapat membuat pekerjaan menjadi efektif dan efisien. Sebelum adanya BIM, kegiatan engineering dilakukan dengan menggunakan metode konvensional atau yang telah dikenal dengan AutoCAD, SAP, Ms. Project yang sering digunakan untuk pekerjaan perencanaan proyek. Pekerjaan menggunakan aplikasi tersebut memakan lebih banyak waktu karena dari masing-masing aplikasi tersebut harus dikerjakan secara manual. Hal ini berbeda dengan BIM yang antar aplikasinya dapat terintegerasi satu sama lain, sehingga dapat mempercepat proses pekerjaan yang akan menyingkat waktu dan juga membuat sumber daya manusia menjadi lebih sedikit. Dalam penelitian ini akan dijelaskan apa saja perbedaan jelas proses perencaan konstruksi khususnya saat pembuatan metode kerja dan shopdrawing yang ditinjau dari segi biaya, mutu, waktu. Dan juga akan mengetahui apa saja kelebihan dan kekurangan BIM karena ini adalah sesuatu yang baru, maka dari tiu untuk penelitian ini dilakukan dengan metode kueisioner dan wawancara kepada para draftrer dan engineer yang sudah berkecimpung didunia konstruksi dan sudah merasakan menggunakan BIM. Dengan studi kasus perencanaan Jalan Tol Jakarta – Cikampek II Selatan (Paket 3) dilakukan perbandingan efiseiensi biaya dan waktu dengan metode konvensional dan BIM. Penelitian ini menghasilkan kesimpulan bahwa aplikasi BIM dapat mempercepat proses pelaksanaan kerja sebesar 43.82%, tetapi berbeda dengan biaya lebih mahal dari konvensional dikarenakan biaya investasi awal untuk lisensi software yang mahal.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.028
Threshold uncertainty score0.094

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0020.002
Meta-epidemiology (narrow)0.0020.001
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0020.002
Science and technology studies0.0020.001
Scholarly communication0.0050.004
Open science0.0010.004
Research integrity0.0020.001
Insufficient payload (model declined to judge)0.0280.010

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.010
GPT teacher head0.204
Teacher spread0.195 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations21
Published2021
Admission routes1
Has abstractyes

Explore more

Same venueConstruction and Material JournalSame topicBIM and Construction IntegrationFrench-language works237,207