INOVASI METODE KERJA PADA KONSTRUKSI TIANG BOR BETON DI TANAH LUNAK PADA PENGGANTIAN JEMBATAN SEI ALALAK

2021· article· en· W3183218005 on OpenAlexaff
Almi Mardhani, Sijadul Jamal

Bibliographic record

VenueJurnal HPJI · 2021
Typearticle
Languageen
FieldEngineering
TopicGeotechnical and construction materials studies
Canadian institutionsWiLAN (Canada)
Fundersnot available
KeywordsPhysicsBridge (graph theory)HumanitiesPileStructural engineeringEngineeringArt

Abstract

fetched live from OpenAlex

Abstract The Sei Alalak Bridge is a bridge that connects Banjarmasin City with Marabahan Regency. To reduce traffic problems on the bridge, it is necessary to replace the old bridge with a new one. The new bridge was planned to have 4 traffic lanes with a total length of 850 m. This study discusses the implementation technique of concrete bore pile construction as a deep foundation for the Sei Alalak Bridge. This paper describes specifically in detail the working method applied, using a rotary drilling system plus several innovations including a strict implementation control system, a stable working platform, the use of polymer modified bentonite and temporary casing for bore piles, and self-compacting concrete mixes. This study shows that the innovative work method applied to this project is able to optimize construction costs compared to other work methods. Keywords: bridge; bridge foundation; concrete bore pile; work method innovation. Abstrak Jembatan Sei Alalak adalah jembatan yang menghubungkan Kota Banjarmasin dengan Kabupaten Marabahan. Untuk mengurangi permasalahan lalu lintas di jembatan, dilakukan penggantian jembatan lama dengan jembatan yang baru. Jembatan baru direncanakan mempunyai 4 lajur lalu lintas dengan panjang total 850 m. Pada studi ini dibahas teknik pelaksanaan konstruksi tiang bor beton sebagai pondasi dalam untuk Jembatan Sei Alalak. Secara khusus pada makalah ini diuraikan dengan rinci metode kerja yang diterapkan, dengan menggunakan sistem rotary drilling ditambah beberapa inovasi yang meliputi sistem kontrol pelaksanaan yang ketat, landasan kerja yang stabil, penggunaan polymer modified bentonite dan selubung sementara tiang bor, serta campuran beton memadat sendiri. Studi ini menunjukkan bahwa inovasi metode kerja yang diterapkan pada proyek ini mampu mengoptimalisasi biaya konstruksi dibandingkan dengan metode kerja yang lain. Kata-kata kunci: jembatan; pondasi jembatan; tiang bor beton; inovasi metode kerja.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Other design · Consensus signal: none
GenreCandidate signal: Methods · Consensus signal: none
Teacher disagreement score0.010
Threshold uncertainty score0.033

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.000
Science and technology studies0.0010.000
Scholarly communication0.0010.000
Open science0.0000.001
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0100.002

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.198
Teacher spread0.190 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designOther design
Domainnot available
GenreMethods

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations2
Published2021
Admission routes1
Has abstractyes

Explore more

Same venueJurnal HPJISame topicGeotechnical and construction materials studiesFrench-language works237,207