MétaCan
Menu
Back to cohort
Record W3213789125 · doi:10.5539/jsd.v14n6p54

An Analysis of the Relationship between Value Diversity and Project Implementation. A Case of Building Construction Projects in Kajiado County, Kenya, Africa.

2021· article· en· W3213789125 on OpenAlexvenueno aff
Benson N. Leyian, Charles M. Rambo, Angeline Sabina Mulwa

Bibliographic record

VenueJournal of Sustainable Development · 2021
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsnot available
Fundersnot available
KeywordsDiversity (politics)Descriptive statisticsGovernment (linguistics)Value (mathematics)Stratified samplingProject teamBuilding constructionWork (physics)BusinessStatisticsSociologyEngineeringComputer scienceKnowledge managementMathematics

Abstract

fetched live from OpenAlex

The process of implementing building construction projects usually involves teams that are made up of individuals who are diverse in several aspects, which can be classified as either deep-level or surface-level diversity. Diversity in work-values has been seen to influence project performance in different fields. During the financial year 2016/2017, the County Government of Kajiado implemented a total of 50 building construction projects, which were meant to be completed within the financial year, but only 48% of the projects were deemed to be successfully implemented by the end of the period. Several factors have been attributed to the low success rate but none has looked at diversity in values among project team member. This research sought to determine the strength and nature of relationship between project team value diversity and building construction projects implementation process in Kajiado county. A pragmatic paradigm was employed in the research. Data was collected using semi-structure questionnaires from a random sample of 251 respondents while interviews were done on 11 key respondents. Descriptive statistics such as percentages, means and standard deviations as well as inferential statistics like correlation and regression were generated from the quantitative data while qualitative data was thematically analysed. It was established that a moderate positive correlation (r=0.401 ) existed between value diversity and project implementation process. It can therefore be inferred that value diversity positively influences the process of implementation of building construction projects.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.004
metaresearch head score (Gemma)0.001
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.129
Threshold uncertainty score0.389

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0040.001
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0020.005
Science and technology studies0.0010.000
Scholarly communication0.0000.001
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.098
GPT teacher head0.374
Teacher spread0.276 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2021
Admission routes1
Has abstractyes

Explore more

Same venueJournal of Sustainable DevelopmentSame topicConstruction Project Management and PerformanceFrench-language works237,207