Dispersed generation interconnection - utility perspective
Bibliographic record
Abstract
Interconnection of generation to an electric distribution system, which is primarily designed to serve radial loads, must not compromise reliability and quality of supply to customers or BC Hydro, the third largest utility in Canada, to determine safety of public and equipment. This paper presents criteria used by requirements for interconnecting a generating source to its distribution system. Presented criteria discuss trade-off involved in specifying the grounding connection of interconnecting transformer or how the size of a distributed generator impacts protection upgrades within the utility system, out-of-step tripping duty on the feeder breaker and requirement of transfer trip to avoid temporary over-voltages. These criteria are applied consistently and uniformly to minimize cost of interconnection engineering. They are based on sound engineering principles to ensure that interconnection upgrades specified are justifiable and defensible, if necessary to the utility's regulator to ensure open access of the grid
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.001 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".