Application framework for safety-centric construction acceleration planning
Why this work is in the frame
A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.
Bibliographic record
Abstract
Purpose Previous research regarding shaping factors and major causes behind accidents in the construction field is reviewed. In particular, a hypothetical model is established to correlate activity time, cost and safety in the context of construction activity acceleration planning. Two demonstration cases are presented to illustrate the proposed theoretical model in the context of critical activity expedition planning. Further, a third case uses a 100-activity project to perform the global level total project time and cost analysis, identifying specific activity acceleration plans that would materialize the shortened total project time at the lowest total project cost. Design/methodology/approach This research proposes a safety-centric application framework to guide construction acceleration planning at both activity and project levels while taking sufficient preventive measures against safety hazards and accidents. As planning construction acceleration by factoring in safety constraints inevitably drives up cost, it is imperative to control increases in activity costs at the local level in connection with schedule acceleration planning while at the same time not compromising on safety. This research also addresses this critical question through performing global level total project time and cost analysis. Findings An application framework is proposed for guiding a planner through identifying accident shaping factors, obeying schedule acceleration rules and accounting for safety-related costs in attempts to mitigate hazardous situations on-site at both activity level (local) and project level (global), resulting in (1) minimizing the increase of total project cost in schedule acceleration while at the same time not compromising on safety at individual activities; (2) producing specific execution plans on each individual activity in terms of the amount of time to crash and the associated activity cost. Originality/value This study is original in developing theories and methods for evaluating the impact of safety constraints upon construction time and cost in activity acceleration planning and project time-cost analysis. The research fills a gap in knowledge in terms of how to factor in sufficient safety constraints while achieving project time and cost objectives on construction acceleration planning at both activity and project levels.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.001 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.001 |
| Science and technology studies | 0.002 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.001 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it