MétaCan
Menu
Back to cohort
Record W4206610425 · doi:10.18280/rces.080402

Research on Fault Ride Through Control Strategy of Wind Farm via MMC-HVDC Networking System

2021· article· en· W4206610425 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

venuePublished in a venue whose home country is Canada.
no affNo Canadian affiliation: this work is invisible to an affiliation-only frame.
No Canadian affiliation. An affiliation-only frame, the usual design, would never have seen this work. It is one of the works that make the case for inverting the frame.

Bibliographic record

VenueReview of Computer Engineering Studies · 2021
Typearticle
Languageen
FieldEngineering
TopicHVDC Systems and Fault Protection
Canadian institutionsnot available
Fundersnot available
KeywordsFault (geology)EngineeringWind powerHigh-voltage direct currentModular designGridTransmission systemElectrical engineeringElectric power transmissionController (irrigation)Low voltage ride throughAC powerTraverseTransmission (telecommunications)Computer scienceVoltageDirect current

Abstract

fetched live from OpenAlex

Large-scale long-distance grid connection of wind farms has problems such as high line losses and small transmission capacity. The use of modular multilevel flexible direct current transmission (MMC-HVDC) for power transmission is an effective solution. And the recovery of system safety and stability under fault conditions is a hot spot for research. For the problem of DC bus voltage rise caused by symmetrical faults on the grid side, the AC voltage step-down method of the wind farm side converter station (WFMMC) is used for coordinated control with the self-regulating energy-consuming circuit. The capacity required for the self-regulating dissipation resistor is reduced while ensuring that the wind farm networked MMC-HVDC system can traverse the fault stably and smoothly; And the controller for suppressing negative sequence current is designed to effectively mitigate the three-phase current imbalance caused by asymmetric faults occurring on the grid side. The active power is transferred to the grid side while protecting the switching devices from damage. Finally, the correctness and effectiveness of the proposed scheme are verified in the PSCAD/EMTDC simulation software.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.951
Threshold uncertainty score0.887

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0010.000
Bibliometrics0.0000.001
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.052
GPT teacher head0.332
Teacher spread0.280 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it