MétaCan
Menu
← Back to cohort
Record W4210537281 · doi:10.1007/s12205-022-0708-y

Dynamic Multi-objective Construction Site Layout Planning Based on BIM

2022· article· en· W4210537281 on OpenAlexaff
Guowu Tao, Haibo Feng, Jingchun Feng, Tianhao Wang

Bibliographic record

VenueKSCE Journal of Civil Engineering · 2022
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsUniversity of British Columbia, Okanagan CampusUniversity of British Columbia
Fundersnot available
KeywordsPlan (archaeology)Building information modelingParticle swarm optimizationQuality (philosophy)Order (exchange)Transport engineeringEngineeringConstruction managementComputer scienceConstruction engineeringOperations researchSystems engineeringCivil engineeringOperations managementScheduling (production processes)

Abstract

fetched live from OpenAlex

The planning effectiveness of construction site layout greatly influences construction efficiency. Many previous studies assumed that all the facilities exist on the construction sites for the whole duration of the projects. Some researchers found the shortcomings and developed models to improve it. But these models also have different limitations, such as ignoring the future impact of the layout decision in early construction phases on the later layout quality, only considering transportation costs when optimize the layouts, etc. To address these issues, this study proposes a building information modeling (BIM)-based model that dynamically optimizes the multi-objective construction site layout. In this model, BIM and construction schedules provide the updated construction project information. This model introduces the construction phase impact on layout. The layout of each construction phase is optimized in order of corresponding phase impact. Considering the sustainable development for construction industry, the noise pollution level is chosen to be the optimization objective together with the total transportation cost. In order to balance the noise pollution level and total transportation cost, the multi-objective particle swarm optimization (MOPSO) is applied to obtain trade-off solutions. A case study is presented to demonstrate the capability of the proposed model. The results indicate that the proposed dynamic construction site layout plan (CSLP) reduces transportation cost by 43.45% and 11.46% compared with the original and static construction site layout. This study breaks the traditional site layout plan order and locates the facilities in order of their phase impact, which can greatly reduce the transportation cost on the site. It also incorporates the noise pollution reduction into CSLP to enhance on-site sustainability.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.015
Threshold uncertainty score0.029

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.001
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0020.001
Bibliometrics0.0020.002
Science and technology studies0.0010.001
Scholarly communication0.0010.001
Open science0.0010.002
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0030.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.006
GPT teacher head0.201
Teacher spread0.195 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations37
Published2022
Admission routes1
Has abstractno

Explore more

Same venueKSCE Journal of Civil Engineering→Same topicBIM and Construction Integration→French-language works237,207→