MétaCan
Menu
Back to cohort
Record W4212889364 · doi:10.25071/2561-5467.275

The construction of USS Atlanta and the Navy seizure of Federal Shipbuilding

2014· article· en· W4212889364 on OpenAlexvenueno aff
David F. Winkler

Bibliographic record

VenueThe Northern Mariner / Le marin du nord · 2014
Typearticle
Languageen
FieldArts and Humanities
TopicHistorical Studies and Socio-cultural Analysis
Canadian institutionsnot available
Fundersnot available
KeywordsAtlantaHumanitiesPolitical scienceNavyArtGeographyMetropolitan areaLawArchaeology

Abstract

fetched live from OpenAlex

Cet article constitue une étude sur les efforts syndicalistes pour organiser le travail dans les chantiers navals entre 1940 et 1942 quand l'expansion de la marine nationale américaine exigeait un accroissement de l'efficacité de production.Le sujet est la construction du croiseur USS Atlanta aux chantiers Federal Shipbuilding dans le New Jersey, qui a été interrompue par une grève menant à une impasse entre direction et les travailleurs récemment organisés.La marine nationale a saisi le chantier en août 1941, et, tout en observant une stricte neutralité sur les questions de travail, a mis en œuvre des mesures de sécurité de travail qui ont atténué les tensions.La construction de l'Atlanta a été achevée en décembre, en avance de la date prévue, et ceci malgré l'interruption du travail.La réponse patriotique des travailleurs à l'attaque japonaise sur Pearl Harbor le 7 décembre 1941 a permis au gouvernement de restituer le chantier à ses propriétaires début janvier 1942.Prior to World War II, the War and Navy Departments procured armaments through competitive bids from multiple suppliers in order to lower costs.In the case of shipbuilding, the Navy not only sought to play contractors against each other, but also against the Navy's government-owned shipyards.To be able to compete successfully for contracts, shipbuilding corporations sought to lower production costs by employing cheap non-union labor.With naval ship contracts far and few between during the 1920s and the early years of the Great Depression, commercial shipyards were able to easily fend off unionization attempts as workers, grateful to have jobs, understood they could be readily replaced.However, with the mobilization for war, labor became a commodity that was in demand as the yards scurried to fill a flood of orders placed by the government.Union organizers were able to leverage the shipyards' need to hire skilled workers, especially welders, to achieve recognition.At Federal Shipbuilding in Kearny, New Jersey the Industrial Union of Marine and Shipbuilding Workers of America (IUMSWA) would achieve recognition and worked towards the goal of making the Kearny facility a closed shop.With management opposed, the union waged a strike in August 1941.Because of the important need to get ships such as the light cruiser Atlanta out from the building ways to join the fleet at a The Northern Mariner/Le marin du nord XXIV, No. 2 (April 2014), 135-152

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.245
Threshold uncertainty score0.487

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.001
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0070.005
Scholarly communication0.0030.001
Open science0.0000.003
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0040.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.009
GPT teacher head0.175
Teacher spread0.166 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2014
Admission routes1
Has abstractyes

Explore more

Same venueThe Northern Mariner / Le marin du nordSame topicHistorical Studies and Socio-cultural AnalysisFrench-language works237,207