Degree Of Compliance With Public Consultation For Awarded Wind Turbine Contracts Under LRP I Process
Bibliographic record
Abstract
Municipalities and residents criticized the planning process for large-scale wind energy projects imposed on them under the Green Energy Act, 2009 (GEA). As such, the Ontario government promised improvements in public engagement, and the FIT policies were replaced by the Large Renewable Procurement (LRP) process. To determine the compliance with the Independent Electricity System Operator’s engagement process under the LRP I, interviews with municipal planners and abutting landowners were conducted, and document information was reviewed. The key findings of this study include: 1) the final results did not support increased engagement statements made by both, former Minister of Energy Bob Chiarelli and Premier of Ontario Kathleen Wynne, as the majority of projects were awarded a contract without municipal support or abutting landowner support; and 2) all developers conducted mandatory consultation; however, the majority failed to truly engage with all stakeholders who would be the most affected by the project.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.001 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".