Record W4255502087 · doi:10.2118/88494-ms

Thru-Tubing Zonal Isolation and Water Shut-Off Utilizing Coiled Tubing in the Java Sea: Operational Challenge & Treatment Strategy

2004· article· en· W4255502087 on OpenAlexaff
Yoliandri Susilo, Wibowo Wahju, Budhira L. Tobing, Imam Arbai, Yasri S. Hendra

Bibliographic record

VenueSPE Asia Pacific Oil and Gas Conference and Exhibition · 2004
Typearticle
Languageen
FieldEngineering
TopicOil and Gas Production Techniques
Canadian institutionsNipawin Bible College
Fundersnot available
KeywordsCoiled tubingCompletion (oil and gas wells)Petroleum engineeringCementSubmarine pipelineOil wellEngineeringGeologyGeotechnical engineeringMaterials science

Abstract

fetched live from OpenAlex

Abstract Almost all the wells in the Offshore North West Java (ONWJ) field penetrate multi-layer reservoirs. To accommodate reservoir management issues, most of these wells were therefore completed in multiple packer completions (dual or single string with multiple packer). As the field is getting mature, more wells are becoming wet and consequently more wells are dying due to water encroachment. Therefore, remedial actions to revive dead wells play an important role to maximize the revenue. To address this issue, thru-tubing cement squeeze and polymer squeeze using coiled tubing have proved to be efficient methods to reduce water production by isolating watered out zones in the ONWJ field. However, the operation of this job can be more complicated when done in multiple packer completion or in dual completion cases, especially when the tubing has leaks in order to avoid the cement or polymer from penetrating other places or productive zones. In several cases, the condition of old tubing that has experienced deformation (buckling/ collapse) has made the task even more challenging. Therefore, treatment strategies must be designed carefully for successful cement/polymer placements into the target zone without affecting production from the other string or zones. From 1999 to 2003, a total of 36 thru-tubing zonal isolation & water shut-off jobs utilizing coiled tubing were done with a high degree of success, although in many cases the tubing had leaks and mechanical problems. Several methods were used and modified to ensure proper cement or polymer placement. Through the use of the innovative "cement packer" technique and inflatable packer, the jobs were accomplished successfully. The coiled tubing has proven to be an effective solution to deal with well conditions in the ONWJ field. This paper will also discuss three case histories, with each case representing different operational challenges.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Other design · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.935
Threshold uncertainty score0.532

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.030
GPT teacher head0.240
Teacher spread0.210 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designOther design
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2004
Admission routes1
Has abstractyes

Explore more

Same venueSPE Asia Pacific Oil and Gas Conference and ExhibitionSame topicOil and Gas Production TechniquesFrench-language works237,207