MétaCan
Menu
Back to cohort
Record W4280517513 · doi:10.1071/aj21121

Techno-economic evaluation of blue hydrogen production with carbon capture and storage for onshore Eastern Australia

2022· article· en· W4280517513 on OpenAlexaff
Devin A. Lacey, Kelly J. Zukowski, J. Gregory Owen, Trisha S. MacDonald

Bibliographic record

VenueThe APPEA Journal · 2022
Typearticle
Languageen
FieldEngineering
TopicReservoir Engineering and Simulation Methods
Canadian institutionsAlberta Bone and Joint Health InstituteCalgary Laboratory Services
Fundersnot available
KeywordsEnvironmental scienceNatural gasProduction (economics)Hydrogen productionWaste managementCarbon capture and storage (timeline)Environmental engineeringEngineeringHydrogenGeologyClimate changeChemistryEconomics

Abstract

fetched live from OpenAlex

This techno-economic assessment models the feasibility of a greenfield blue hydrogen development with production capacity of 400 tons of hydrogen per day (TH2/day). At an assumed 85% CO2 recovery rate, the 400 TH2/day production scale equates to a need for approximately 1.241 million tons of CO2 per year (MtCO2/year) of subsurface CO2 storage capacity over an assumed project life of 25 years (approximately 31 Mt of total CO2 sequestered). The blue hydrogen production technology applied to the assessment is a Steam Methane Reformer (SMR) with two points of CO2 recovery (pre-combustion process stream amine scrubbing and post-combustion flue gas capture). The remaining key scope components are the CO2 compression and dehydration system, 65 km of CO2 distribution pipeline and a CO2 injection and storage hub comprised of three injection wells, three deep observation wells and three groundwater monitoring wells. The study includes the screening process applied to identify five high-grade depleted gas reservoirs in the Cooper Basin that are the CO2 storage candidates, and which ultimately define the project location. The economic evaluation of the project includes the definition of cost and operations estimates to determine a mean project case and then applies a Palisade @Risk probabilistic distribution model to key project inputs as to risk the project under various scenarios. The analysis concludes that the economic viability of large-scale, greenfield blue hydrogen projects in Australia is highly dependent on hydrogen sale price, Australian Carbon Credit Unit (ACCU) value, wholesale natural gas prices and capital cost efficiency.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.003
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.055
Threshold uncertainty score0.109

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0020.003
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0000.001
Bibliometrics0.0010.001
Science and technology studies0.0010.001
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0020.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.039
GPT teacher head0.285
Teacher spread0.246 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations4
Published2022
Admission routes1
Has abstractyes

Explore more

Same venueThe APPEA JournalSame topicReservoir Engineering and Simulation MethodsFrench-language works237,207