MétaCan
Menu
Back to cohort
Record W4282564378 · doi:10.1108/ecam-02-2022-0170

The latest operational, contractual and organizational trends in IPD literature: review and future directions

2022· article· en· W4282564378 on OpenAlexaff
Sara Rankohi, Mario Bourgault, Ivanka Iordanova

Bibliographic record

VenueEngineering Construction & Architectural Management · 2022
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsÉcole de Technologie SupérieurePolytechnique Montréal
Fundersnot available
KeywordsOriginalityContext (archaeology)Thematic analysisSystematic reviewDomain (mathematical analysis)Knowledge managementManagement scienceComputer scienceData sciencePolitical scienceQualitative researchEngineeringSociologySocial scienceGeographyMEDLINE

Abstract

fetched live from OpenAlex

Purpose Integrated project delivery (IPD) has attracted considerable attention in recent years, however only a few review studies captured the dynamic and evolving nature of this topic. The purpose of this study is to review the most recent IPD publications, in order to shed light on future research. Design/methodology/approach Using a systematic review methodology, the study aims to synthesize the current IPD literature, and frame the latest research and development in this domain. A systematic review is conducted to identify the current state-of-the-art of IPD research and the latest research themes and trends in this domain. A bibliometric analysis is performed to explain characteristics of screened articles, and through a thematic analysis the latest themes and trends are recognized. Findings In this study, based on IPD characteristics (contractual-regulative, operational-cognitive and organizational-structural), research themes (legal, commercial, technological, procedural, cultural and structural), sub-themes and their associated trends are identified. The latest emerging trends are mostly related to the contractual characteristics of IPD, and are focused on the combination of IPD with new business models and developing contractual guidelines for promoting IPD applications in off-site and on-site construction projects. Originality/value This research contributes to the body of knowledge by synthesizing the state of the art of IPD in construction literature and exposing the latest research trends in this area. A theoretical framework of integration in an IPD context is developed, based on the literature. Finally, future areas of studies are discussed.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.015
metaresearch head score (Gemma)0.046
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Review · Consensus signal: Review
Teacher disagreement score0.020
Threshold uncertainty score0.078

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0150.046
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0020.002
Bibliometrics0.0200.024
Science and technology studies0.0010.002
Scholarly communication0.0060.008
Open science0.0020.002
Research integrity0.0030.002
Insufficient payload (model declined to judge)0.0040.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.002
GPT teacher head0.174
Teacher spread0.171 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreReview

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations13
Published2022
Admission routes1
Has abstractyes

Explore more

Same venueEngineering Construction & Architectural ManagementSame topicBIM and Construction IntegrationFrench-language works237,207