MétaCan
Menu
Back to cohort
Record W4284899645 · doi:10.36680/j.itcon.2022.031

An earned-value-analysis (EVA)-based project control framework in large-scale scaffolding projects using linear regression modeling

2022· article· en· W4284899645 on OpenAlex
Zhen Lei, Yongde Hu, Jialiang Hua, Brandon Marton, Noah Marton Peter Goldberg, Noah Marton

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.

Bibliographic record

VenueJournal of Information Technology in Construction · 2022
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsUniversity of New Brunswick
Fundersnot available
KeywordsEarned value managementScheduleProductivityComputer scienceProject managementScale (ratio)ScaffoldEngineeringIndustrial engineeringSystems engineeringOperations researchProject planningOPM3

Abstract

fetched live from OpenAlex

In large-scale industrial construction projects, scaffolding activities account for a large amount of the construction budget, and overlooking the scaffolding management can lead to budget overruns and schedule delays. The scaffolding activities can be categorized by classifications and types based on the nature of the scaffold builds. To ensure the project progress on track, it is critical to measure project performance based on project progress data. However, given the nature of scaffolding activities, it has been challenging to track and utilize the scaffolding data for analytical purposes. Therefore, this paper proposes a project control framework based on Earned-value analysis (EVA), in which linear regression models are used for productivity prediction. Three scenarios of productivity based on historical data (i.e., low, medium, and high productivity) are introduced. The proposed framework is implemented in a real construction project for validation. The results have shown that the proposed framework can efficiently evaluate the project progresses integrated with the EVA. The construction companies, such as general contractors and scaffolding sub-contractors, can use this method for site progress tracking. For future work, the EVA can be integrated with other non-linear predictive models (e.g., neural network) for productivity prediction. The EVA results can be integrated with data visualization to create situational awareness for construction practitioners.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.386
Threshold uncertainty score0.662

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0050.003
Science and technology studies0.0000.000
Scholarly communication0.0000.001
Open science0.0000.000
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.010
GPT teacher head0.262
Teacher spread0.252 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it