Bibliographic record
Abstract
The Architecture Engineering and Construction (AEC) industry has been criticized for low productivity, lack of innovations, damage to the environment, lack of improvement. Several innovations have emerged to address these problems and, in this paper, the relationship between operations management (OM) and offsite construction will be discussed. The purpose of this paper is to present a proposal for the application of OM concepts in offsite construction. A research method based on the assumption that construction processes can be analyzed as production systems will be used. The resulting proposal consists of the exploration of potential applications, benefits, and barriers of OM in offsite construction based on the current experience of OM in manufacturing processes. A thorough discussion about the implications of this proposal in a project and supply chain levels are presented. The most important conclusions were related to the need for applying OM concepts in offsite construction projects and the need for more research in this direction to prove the proposed proposal.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.001 | 0.001 |
| Science and technology studies | 0.001 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.001 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".