MétaCan
Menu
Back to cohort
Record W4296077643 · doi:10.29173/mocs286

Operations management concepts applied to offsite construction

2022· article· en· W4296077643 on OpenAlexvenueno aff
Guillermo Prado Lujan

Bibliographic record

VenueModular and Offsite Construction (MOC) Summit Proceedings · 2022
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsnot available
Fundersnot available
KeywordsProductivityConstruction managementConstruction engineeringConstruction industryProduction (economics)Risk analysis (engineering)ArchitectureEngineeringEngineering managementSystems engineeringComputer scienceBusinessCivil engineering

Abstract

fetched live from OpenAlex

The Architecture Engineering and Construction (AEC) industry has been criticized for low productivity, lack of innovations, damage to the environment, lack of improvement. Several innovations have emerged to address these problems and, in this paper, the relationship between operations management (OM) and offsite construction will be discussed. The purpose of this paper is to present a proposal for the application of OM concepts in offsite construction. A research method based on the assumption that construction processes can be analyzed as production systems will be used. The resulting proposal consists of the exploration of potential applications, benefits, and barriers of OM in offsite construction based on the current experience of OM in manufacturing processes. A thorough discussion about the implications of this proposal in a project and supply chain levels are presented. The most important conclusions were related to the need for applying OM concepts in offsite construction projects and the need for more research in this direction to prove the proposed proposal.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.821
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0010.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.005
GPT teacher head0.194
Teacher spread0.189 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2022
Admission routes1
Has abstractyes

Explore more

Same venueModular and Offsite Construction (MOC) Summit ProceedingsSame topicBIM and Construction IntegrationFrench-language works237,207