MétaCan
Menu
Back to cohort
Record W4308844374 · doi:10.1007/s40243-022-00216-1

Design of an isolated renewable hybrid energy system: a case study

2022· article· en· W4308844374 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.

Bibliographic record

VenueMaterials for Renewable and Sustainable Energy · 2022
Typearticle
Languageen
FieldEnergy
TopicHybrid Renewable Energy Systems
Canadian institutionsInstitut National de la Recherche Scientifique
Fundersnot available
KeywordsRenewable energyWind powerEnvironmental scienceEnvironmental economicsSolar energyPhotovoltaic systemBiomass (ecology)Cost of electricity by sourceIntermittent energy sourceElectricity generationDistributed generationMeteorologyEngineeringElectrical engineeringEconomicsEcologyGeography

Abstract

fetched live from OpenAlex

Abstract In addition to the fact that most renewable energies such as solar and wind energy have become more competitive in the global energy market, thanks to the great development in conversion technologies, it believes that renewable energy can play a crucial role in global environmental issues. However, in Palestine, the situation is different from anywhere else; renewable energy is not only an economic option, but an absolute necessity to get out of the energy crisis that Palestinian cities suffer from long years ago and continue nowadays . The cornerstone of the present research is focusing on the availability of renewable energy resources in Jenin Governorate (JG)—West Bank (WB)—Palestine. Two-year time-series of hourly solar, wind, biomass, and 1-year hourly electrical load data are used in the analysis in this paper. The energy potentials were estimated using System Advisor Model software (SAM), and the optimum combination and sizing of the hybrid renewable energy system were determined using Hybrid Optimization of Multiple Energy Resources (HOMER). The proposed Hybrid Renewable Energy System (HRES) consists of an 80 MW PV solar field, 66 MW wind farm, and 50 MW biomass system with an initial investment of $323 M. The proposed HRES generates 389 GWh/yr and is enough to meet 100% of the electrical demand of JG (372 GWh/yr) with excess in electricity generation of about 4.57% and the unmeet electric load is about 109.6 MWh/yr which is equivalent to less than 2 h off in a year. The estimated Levelized Cost of Energy (LCOE) was found as 0.313 $/kWh.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.004
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow), Science and technology studies
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.807
Threshold uncertainty score0.999

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0040.000
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0020.000
Bibliometrics0.0010.001
Science and technology studies0.0020.000
Scholarly communication0.0000.001
Open science0.0010.001
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.013
GPT teacher head0.227
Teacher spread0.214 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it