MétaCan
Menu
Back to cohort
Record W4309848589 · doi:10.3390/en15238838

Solar Energy Implementation in Manufacturing Industry Using Multi-Criteria Decision-Making Fuzzy TOPSIS and S4 Framework

2022· article· en· W4309848589 on OpenAlexaff
Pedro Ponce, Citlaly Pérez, Aminah Robinson Fayek, Arturo Molina

Bibliographic record

VenueEnergies · 2022
Typearticle
Languageen
FieldDecision Sciences
TopicMulti-Criteria Decision Making
Canadian institutionsUniversity of Alberta
Fundersnot available
KeywordsPhotovoltaic systemTOPSISSolar energyContext (archaeology)Decision support systemAutomationManufacturingRenewable energyFuzzy logicEngineeringComputer scienceEnvironmental economicsRisk analysis (engineering)Operations researchBusinessMechanical engineeringArtificial intelligenceEconomicsMarketingElectrical engineering

Abstract

fetched live from OpenAlex

The demand for electrical energy has increased since the population of and automation in factories have grown. The manufacturing industry has been growing dramatically due to the fast-changing market, so electrical energy for manufacturing processes has increased. As a result, solar energy has been installed to supply electrical energy. Thus, assessing a solar panel company could be a complex task for manufacturing companies that need to assess, install, and operate solar panels when several criteria with different hierarchies from decision-makers are involved. In addition, the stages of a solar panel system could be divided into analysis, installation, operation, and disposal, and all of them must be considered. Thus, the solar panel company must provide a holistic solution for each stage of the solar panel lifespan. This paper provides a fuzzy decision-making approach (Fuzzy TOPSIS) to deal with the assessment of solar companies using the S4 framework in which the sensing, smart, sustainable, and social features are labeled with linguistic values that allow the evaluation of companies using fuzzy values and linguistic labels, instead of using crisp values that are difficult to define when decision-makers are evaluating a solar company for installation of the solar panels. The S4 features are considered the benefits of the evaluation. In the case study presented, three solar panel companies with different alternatives are evaluated on the basis of three decision-makers from manufacturing companies using the S4 framework. This paper considers the benefits of solar companies in the context of decision-makers participating in a multi-decision selection of such a company to install solar panels, so that the selection process is more effective. Thus, the proposed Fuzzy TOPSIS method proved efficient when selecting a solar panel company from among many options that best meets the needs of manufacturing companies.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.003
metaresearch head score (Gemma)0.002
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow), Insufficient payload (model declined to judge)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Other design · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.814
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0030.002
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0010.000
Bibliometrics0.0010.001
Science and technology studies0.0010.000
Scholarly communication0.0010.001
Open science0.0010.002
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0030.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.107
GPT teacher head0.451
Teacher spread0.344 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designOther design
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations20
Published2022
Admission routes1
Has abstractyes

Explore more

Same venueEnergiesSame topicMulti-Criteria Decision MakingFrench-language works237,207