MétaCan
Menu
Back to cohort
Record W4312335683 · doi:10.31963/intek.v9i1.3789

PVSYST-Based Solar Power Plant Planning

2022· article· en· W4312335683 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

aboutThe title or abstract carries a Canadian signal from the geographic lexicon.
no affNo Canadian affiliation: this work is invisible to an affiliation-only frame.
No Canadian affiliation. An affiliation-only frame, the usual design, would never have seen this work. It is one of the works that make the case for inverting the frame.

Bibliographic record

VenueINTEK Jurnal Penelitian · 2022
Typearticle
Languageen
FieldEngineering
TopicEngineering and Technology Innovations
Canadian institutionsnot available
Fundersnot available
KeywordsSizingSoftwareGridPhotovoltaic systemElectricityComputer scienceController (irrigation)EngineeringAutomotive engineeringElectrical engineeringOperating system

Abstract

fetched live from OpenAlex

This research uses the PVSyst software which can plan an off-grid SPP system and find out how much electricity is generated in the Auditorium Building Campus 2, Ujung Pandang State Polytechnic. PVSyst is a software package that is used for the learning process, sizing, and data analysis of the PV mini-grid system. PVSyst is divided into grid connected systems, standalone systems, pumping systems. PVSyst is also equipped with a database from a wide and diverse range of meteorological data sources, as well as data on PV mini-grid components. In planning a PVSyst-based solar power plant, it can be used to find out how much electrical energy is generated to meet the electricity needs of the Campus 2 Auditorium Building, Ujung Pandang State Polytechnic. In this study using the PVSyst software according to the proposed load requires an average energy of 482 kWh/day, therefore, the panel module used is the polycrystalline type model CS3W-410P-HE manufacturer Canadian Solar Inc, where each panel unit used has a nominal power of 410 WP requires 422 modules, 2 modules in series and 211 modules in parallel. The battery used is a lead acid type with a 12-CS-11PS model manufactured from Rolls. The batteries used are 195 batteries, of which 3 batteries are installed in series and 64 batteries are installed in parallel. The controllers needed in this design are 50 units with the FLEXmax 80-36V model manufactured from Outback. The technology of this controller is an MPPT converter. In planning Solar Power Plant using PVSyst in the Auditorium Building Campus 2 of Ujung Pandang State Polytechnic, it produces electricity of 227,122 kWh per year.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.627
Threshold uncertainty score0.630

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.009
GPT teacher head0.204
Teacher spread0.195 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it