MétaCan
Menu
Back to cohort
Record W4380882025 · doi:10.1145/3575813.3597353

Making a Virtual Power Plant out of Privately Owned Electric Vehicles: From Contract Design to Scheduling

2023· article· en· W4380882025 on OpenAlexafffund
Saidur Rahman, Javier Sales-Ortiz, Omid Ardakanian

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicElectric Vehicles and Infrastructure
Canadian institutionsUniversity of Alberta
FundersNatural Sciences and Engineering Research Council of Canada
KeywordsVirtual power plantGridProfitability indexProfit (economics)Computer scienceOffset (computer science)Battery (electricity)Energy storageScheduling (production processes)Automotive engineeringElectrical engineeringRenewable energyBusinessFinancePower (physics)Distributed generationEngineeringOperations managementEconomicsOperating systemMicroeconomics

Abstract

fetched live from OpenAlex

With the rollout of bidirectional chargers, electric vehicle (EV) battery packs can be used in lieu of utility-scale energy storage systems to support the grid. These batteries, if aggregated and coordinated at scale, will act as a virtual power plant (VPP) that could offer flexibility and other services to the grid. To realize this vision, EV owners must be incentivized to let their battery be discharged before it is charged to the desired level. In this paper, we use contract theory to design incentive-compatible, fixed-term contracts between the VPP and EV owners. Each contract defines the maximum amount of energy that can be discharged from an EV battery and exported to the grid over a certain period of time, and the compensation paid to the EV owner upon successful execution of the contract, for reducing the cycle life of their battery. We then propose an algorithm for the optimal operation of this VPP that participates in day-ahead and balancing markets. This algorithm maximizes the expected VPP profit by taking advantage of the accepted contracts that are still valid, while honoring day-ahead commitments and fulfilling the charging demand of each EV by its deadline. We show through simulation that by offering a menu of fixed-term contracts to EVs that arrive at the charging station, trading energy and scheduling EV charging according to the proposed algorithm, the VPP profitability increases by up to 12.2%, while allowing EVs to partially offset the cost of charging their battery.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.004
metaresearch head score (Gemma)0.006
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.005
Threshold uncertainty score0.019

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0040.006
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0000.001
Science and technology studies0.0010.002
Scholarly communication0.0020.003
Open science0.0020.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0030.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.025
GPT teacher head0.241
Teacher spread0.216 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations7
Published2023
Admission routes2
Has abstractyes

Explore more

Same topicElectric Vehicles and InfrastructureFrench-language works237,207